Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.7 LAccepted-AOC | ₹82.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹82.8 LRejected-AOC NO 164 HARERAM NAGAR RAJAJIIPURAM TVLR 602 001 | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 602001 | ₹82.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S.J M Constructions L2 | G SELVARANI L1 |
|---|---|---|---|---|---|
| 1.00Providing Drainage With Cover slab In Ezhil Nagar Main Road in Ayapakkam Panchayat UNDER CMDA FUND | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 1,096.46 | cum | 266 ₹2,91,658.36 | 263 ₹2,88,368.98 |
| 3.00 | Collection and supply of M sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 91.37 | cum | 2,064 ₹1,88,587.68 | 2,059 ₹1,88,130.83 |
| 4.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 91.37 | cum | 5,782 ₹5,28,301.34 | 5,778 ₹5,27,935.86 |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc footing including cost and conveyance and all labour charges etc. | 3,793 | sqm | 548 ₹20,78,564 | 547.25 ₹20,75,719.25 |
| 6.00 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | 5.71 | mt | 91,865 ₹5,24,549.15 | 91,855 ₹5,24,492.05 |
| 7.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance and all labour charges etc. | 356.87 | cum | 6,534.5 ₹23,31,967.02 | 6,531 ₹23,30,717.97 |
| 8.00 | Reinforced Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance and all labour charges etc. | 85.18 | cum | 8,855 ₹7,54,268.9 | 8,852 ₹7,54,013.36 |
| 9.00 | Cost and Supply of Man hole Cover SOR P-55 SLNO-238 | 172 | nos | 1,869 ₹3,21,468 | 1,863 ₹3,20,436 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 12,63,485.6 ₹12,63,485.6 | 12,61,766.57 ₹12,61,766.57 |
Tender Value
₹83.5 L
EMD Value
₹84,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Project Director
DRDA Tiruvallur
Providing Drainage with cover slab 1 work in Ayapakkam panchayat Under CMDA fund Pac.VKM 07
2026_RDTN_651840_1
0818/2026/A7 Dt.04.02.2026
Open Tender
Civil Works
120 days
Villivakkam
as per eligible criteria
5 documents required · 5 mandatory
₹0
₹84,000
Yes
11 Jun 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
7 Feb 2026
Providing Drainage With Cover slab In Ezhil Nagar Main Road in Ayapakkam Panchayat UNDER CMDA FUND
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete.
Collection and supply of M sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc footing including cost and conveyance and all labour charges etc.
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance and all labour charges etc.
Reinforced Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance and all labour charges etc.
Cost and Supply of Man hole Cover SOR P-55 SLNO-238
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tech_bid_VKM_07.pdf
Tender Documents • 0.58 MB
PRICE_BID_VKM_07.pdf
Additional Documents • 0.26 MB
BOQ_781620.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid