Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹3.8 L+₹31,000 (8.97%)Rejected-AOC TUTICORIN TAMIL NADU | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S YOGARAJ CONTRACTOR L2 | VELSHANKARS ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for cleaning and removal of “hand-hole” plate from the platen water wall & Economizer inlet header by using hand-hole cutting machine, removal of debris, such as welding slag, oxide-deposits, scales, foreign materials from the headers, grinding and edge preparation of the old/new hand-hole plate & header, IBR welding with special grade welding electrodes. Charges inclusive of transportation of materials, Tools & Plants, consumables, such as gas, TIG set, special grade welding electrodes, etc | 3 | Header | 1,57,500 ₹1,85,850 | 1,56,000 ₹1,84,080 Lowest |
| 2.00 | Providing temporary platforms at required elevation of non approaching area in platen water wall & Economizer inlet headers of boiler and dismantling after attending work. | 3 | No. | 9,000 ₹10,620 | 7,500 ₹8,850 Lowest |
| 3.00 | Charges for Grinding of LTSH inlet header for Arc filling of size 150 x 25 mm² area for 3 layers | 35 | No. | 1,40,000 ₹1,65,200 | 1,26,000 ₹1,48,680 Lowest |
| 4.00 | Charges for IBR Welder for Arc filling of area 150 x 25 mm² by 3 layers | 35 | No. | 70,000 ₹82,600 | 56,000 ₹66,080 Lowest |
Tender Value
Refer Docs
EMD Value
₹3,500
Closing Date
25 Feb 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit I Inspection of Platen water wall headers Economizer inlet header removal of debris and strengthening of LTSH inlet header during 2025 2026 overhaul
2026_EB_653953_1
CE/TTPS/SE/M-II/No.411/2025-26
Open Tender
Miscellaneous Works
Item Rate
40 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹3,500
Yes
1 Sept 2026
10 Feb 2026
26 Feb 2026
10 Feb 2026
25 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for cleaning and removal of “hand-hole” plate from the platen water wall & Economizer inlet header by using hand-hole cutting machine, removal of debris, such as welding slag, oxide-deposits, scales, foreign materials from the headers, grinding and edge preparation of the old/new hand-hole plate & header, IBR welding with special grade welding electrodes. Charges inclusive of transportation of materials, Tools & Plants, consumables, such as gas, TIG set, special grade welding electrodes, etc | 3 | Header | 55 | ₹165 |
| 2 | Providing temporary platforms at required elevation of non approaching area in platen water wall & Economizer inlet headers of boiler and dismantling after attending work. | 3 | No. | 55 | ₹165 |
| 3 | Charges for Grinding of LTSH inlet header for Arc filling of size 150 x 25 mm² area for 3 layers | 35 | No. | 55 | ₹1,925 |
| 4 | Charges for IBR Welder for Arc filling of area 150 x 25 mm² by 3 layers | 35 | No. | 55 | ₹1,925 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_784177.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .