| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.5 L+₹12,730 (2.89%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.6 L+₹16,182.40 (3.67%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
6 Jan 2022, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
128/ETC-II(P)/ 2021-2022
2021_UPTCL_666968_1
128/ETC-II(P)/ 2021-2022
Open Tender
Electrical Works
Item Rate
90 days
Yamuna Pump Canal
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE,ETD-NAINI,PRAYAGRAJ
₹4,500
12 May 2022
30 Dec 2021
7 Jan 2022
30 Dec 2021
6 Jan 2022
30 Dec 2021
Amount
Following works to be carried out for replacement of gaskets including other associated work for 132/33 KV 20 MVA T/F-I (NGEF make) at 132 KV S/S YPC under ETD-III Prayagraj with all cost of man, material T&P as per technical specification for proper completion of the work with due safety and precautions as per direction of supervising engineer:-
Opening of jumpers of HV/LV side bushing and removal of earthing strip from neutral bushing.
Dismantling of 20 MVA Transformer-I accessories including radiator, bushing, buchholz relay oil pipe line from conservator tank to main tank, oil pipe lie to OLTC and surge relay conservator tank.
Complete drain out of old transformer oil from the existing 20 MVA Transformer-I into empty oil drums/oil tanker and storage of oil drums at stores/designated place to storage.
Loading of 20 KL oil storage tank from 132 KV S/S Shankergarh Prayagraj then safe carriage oil tank from 132 KV S/S Shankergarh to 132 KV S/S YPC and unloading the same to the places instructed by supervising engineer. (distance approx 15 KM). vehicle/trailer and man power provided by contractor at his own cost.
Replacement of all gaskets including the top cover gaskets of transformer by providing and fixing of new gaskets as per existing size made of rubberized cork sheet Kotika/Turboze/ NU Cork brand grade 07 after due fabrication.
Cleaning of core and winding by transformer oil and removal of sludge from bottom of main tank.
Applying vacuum to above transformer up to 760 mm of HG for 24 Hrs. with adequate capacity vacuum pumps after necessary blanking/ erection as per requirement.
Filling of dry nitrogen gas having DEW point (-60°c to (-) 65°c under vacuum from top value of transformer up to pressure of 3 PSI and maintaining the same in the tank for 12 Hrs. including cost of nitrogen gas and nitrogen gas filling device.
Creating vacuum inside the main tank for period for 12 hrs. And filling of centrifuged new transformer oil in main tank of required BDV after preparation in 20 KL oil tanker.
Complete erection of 20 MVA transformer-I including radiator conservator tank, bushing with its turrets connecting oil pipe line, erection of cooling fans making control cables connection, Buchhloz relay etc. topping up of transformer oil and final oil filling in the main tank, radiator, conservator tank and all other accessories.
Centrifuging of following transformer oil in transformer tank or oil tanker by connecting centrifuging pipes, circulating the transformer oil through centrifuging machine and taking BDV values of the oil periodically till the required value is achieved as per direction of supervising engineer and also measurement of PPM. All labor, T&P Centrifuging machine shall be provided by contractor at his own cost.
Overhauling of diverter switch after removing of oil and dirty transformer oil from its chamber, filling the fresh centrifuged transformer oil after necessary centrifuging for proper BDV value as per norms of the transformer.
Conducting BDV, PPM, DGA, TAN DELTA tests of T/F oil of 20 MVA T/F prior to chrging and after passing of 15 days from date of charging. Job includes sample collection of T/F oil in suitable container and its transportation to NABL certified LAB and submitting its test reports. (All test charges on contractors account).
Meena Elect & Engg. Works
M/s S.S. Refregeration
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .