| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 LAccepted-AOC | ₹2.6 L | 1 | Accepted-AOC Bidder Quoted Value is Less than the Estimate Amount |
| 2 | 2₹2.7 L+₹9,330 (3.61%)Rejected-Finance | ₹2.7 L+₹9,330 (3.61%) | 2 | Rejected-Finance Bidder Quoted Value is Greater than the Estimate Amount reject |
| Sl No | Description | Qty | Unit | K. Rajendran L2 | Ehan Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 46 | 1M³ | 181 ₹8,326 | 180 ₹8,280 Lowest |
| 2.00 | Conveyance of excavated earth to a lead of 0 to 5 Km including cost of loading, transporting etc., complete complying with standard specification. | 28 | 1M³ | 93 ₹2,604 | 90 ₹2,520 Lowest |
| 3.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 6 | 1M³ | 5,001 ₹30,006 | 5,000 ₹30,000 Lowest |
| 4.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 2.10M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton and as directed by the departmental Officers (Payment for centering shall be given after the concrete is laid) | 111 | 1M² | 485 ₹53,835 | 452 ₹50,172 Lowest |
| 5.00 | Plain Cement Concrete1:2:4 (one cement,two crushed stones and and four hard broken stone jelly using 20mm jelly for wearing coat including laying,compacting,finishing and curing,etc.,complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | 19 | 1M³ | 6,306 ₹1,19,814 | 6,150 ₹1,16,850 Lowest |
| 6.00 | Plastering the surface of walls with Cement Mortar 1:4 (One cement and Four plastering sand), 20mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used , curing etc., complete complying with standard specification and as directed by the departmental officers. | 22 | 1M² | 552 ₹12,144 | 500 ₹11,000 Lowest |
| 7.00Add GST @ 18% | |||||
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
9 Jul 2026, 3:00 pmClosed
Assistant Commissioner
Tiruppur City Municipal Corporation Zone 2
Construction of Strom Water Drain at SV Colony 8th Street in Ward No 20
2026_MAWS_681762_8
E1/1574/2026/Z2
Open Tender
Civil Works
Works
90 days
Tiruppur City Municipal Corporation Zone 2
Please Refer to Tender Notice
3 documents required · 3 mandatory
₹0
₹6,000
Yes
2 Sept 2026
20 Jun 2026
9 Jul 2026
20 Jun 2026
9 Jul 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 46 | 1M³ | - | - |
| 2 | Conveyance of excavated earth to a lead of 0 to 5 Km including cost of loading, transporting etc., complete complying with standard specification. | 28 | 1M³ | - | - |
| 3 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 6 | 1M³ | - | - |
| 4 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 2.10M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton and as directed by the departmental Officers (Payment for centering shall be given after the concrete is laid) | 111 | 1M² | - | - |
| 5 | Plain Cement Concrete1:2:4 (one cement,two crushed stones and and four hard broken stone jelly using 20mm jelly for wearing coat including laying,compacting,finishing and curing,etc.,complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | 19 | 1M³ | - | - |
| 6 | Plastering the surface of walls with Cement Mortar 1:4 (One cement and Four plastering sand), 20mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used , curing etc., complete complying with standard specification and as directed by the departmental officers. | 22 | 1M² | - | - |
| 7 | Add GST @ 18% | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
8.pdf
Tender Documents • 0.41 MB
BOQ_819459.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .