Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.4 LAccepted-AOC 356 1 SHIKHORIA PARA SHIKHORIA PARA BANKURA WEST BENGAL 722101 | BANKURA | BANKURA | WEST BENGAL | 722101 | ₹52.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹52.5 L+₹10,530 (0.20%)Rejected-Finance BARAKURPA POST RATANPUR DIST BANKURA PIN 722152 | RATANPUR | BANKURA | WEST BENGAL | 722152 | ₹52.5 L+₹10,530 (0.20%) | L2 | Rejected-Finance UNSUCCESFUL-L2 |
| 3 | L3₹52.6 L+₹21,060 (0.40%)Rejected-Finance | ₹52.6 L+₹21,060 (0.40%) | L3 | Rejected-Finance UNSUCCESFUL-L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not eligible due to non submission of Bank Solvency documents |
Tender Value
₹52.7 L
EMD Value
₹1.1 L
Closing Date
18 Aug 2026, 12:00 pmClosed
Executive Engineer, Bankura Division, PWD
Office of the Executive Engineer Bankura Division PWD Kenduadihi Bankura
Bankura Link Road (Machantala to Kathjuridanga via Gobindanagar Bus Stand ) 0.00 Kmp to 5.190 Kmp- Construction of PCC Retaining Wall at 2.10 KM in the District of Bankura under Bankura Division PWD during the year 2026-2027
2026_WBPWD_5017613_2
WBPWD/EE/BANKURA DIVISION/NIT- 08/2026-2027
Open Tender
CIVIL WORKS
Percentage
90 days
Bankura
Please refer Tender documents.
4 documents required · 4 mandatory
₹1.1 L
23 Sept 2026
29 Jul 2026
20 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (Reference to MORT&H's specification 304).
Ordinary soil
Manual Means
Depth upto 3 m | 360 | Cum | 151.66 | ₹54,597.6 |
| 2 | Sand Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in-charge.(Reference to MORT&H's specification 304).
Compaction factor of dry clean sand is 0.835 | 150 | Cum | 999.8 | ₹1,49,970 |
| 3 | Plain/Reinforced cement concrete in open foundation complete all including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200).
Using Concrete Mixer
Inclusing 4.0% extra cost as formwork over cost of material
PCC Grade M20
(with pakur varieties stone material) | 315.5 | Cum | 6,604.75 | ₹20,83,798.63 |
| 4 | Back filling behind abutment, wing wall and return wall complete including spriklring water and throughly compacted with plate compactor/power rammer in layers not exceeding 150mm compacted thickness as per drawing and Technical Specification (710.1.4 of IRC:78 & MoRTH's specification 2200)
Sandy material | 72 | Cum | 1,264.14 | ₹91,018.08 |
| 5 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC/PVC/HDPC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (Reference to MORT&H's specifications 2706 & 2200). | 200 | Each | 149.83 | ₹29,966 |
| 6 | Excavation in Soil with Dozer with lead up to 100 metres
Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment up to a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections (Reference to MoRT&H's specification clause 301).
Note-Complete Rate (Including material cost) | 500 | Cum | 166.21 | ₹83,105 |
| 6.01 | Case-I
Compacting original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 & 300-1 for sub-grade.Construction (Reference to MoRT&H's specification clause 305.3.4). | 500 | Cum | 70.52 | ₹35,260 |
| 7 | Granular Sub-base with Graded Material (Table:- 400-1) A. Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(v) Grading –III (Drainage Layer )
Using Pakur Variety Stone Chips-26.50 mm size -0.48 m3/m3, 5.60 mm- 0.54 m3/m3 and 0.075mm -0.26 m3/m3 | - | Cum | 3,014.6 | - |
| 7.01 | Granular Sub-base with Graded Material (Table:- 400-1) A. Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(v) Grading – V (Filter -separation Layer )
Using Pakur Variety Stone Chips-53.0 mm size -0.13 m3/m3, 26.50mm- 0.22 m3/m3, 10.0mm- 0.290 m3/m3 5.60 mm- 0.19 m3/m3, 2.36 mm- 0.260 m3/m3, 0.85mm- 0.120 m3/m3, 0.075mm- 0.425 m3/m3 | - | Cum | 3,728.91 | - |
| 8 | Water Bound Macadam Base Course
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Using Pakur Variety Stone Chips
By Manual Means
Grading-1(Table 400-9)
Using Screening (Table 400-10) Type-A (13.2 mm aggregate)
Grading-I Aggregate (63 mm 0.07 m3/m3, 53mm-0.59 m3/m3, 45mm-0.56 m3/m3, 22.40mm-.10 m3/m3 Using Stone Screening Type A 5.60mm-0.13m3/m3, 180 micron- 0.05 & binding materials, (2.36 to 75 micron ) 0.08 m3/m3 | - | Cum | 4,454.86 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
2911-ii.pdf
Tender Documents • 0.58 MB
BOQ_5087930.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .