| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.8 L+₹6,033.94 (0.69%)Rejected-Finance PATRA MARKET KRISHANAGAR NADIA | KRISHANAGAR | NADIA | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.8 L+₹9,653.56 (1.10%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
1 Nov 2019, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla, Kolkata- 700027
Illumination and water arrangement at different station of Chemaguri point in connection with Ganga Sagar Mela-2020
2019_PHED_246483_1
WBPHE/EE/SMD/NIeT- 10 of 2019-2020
Open Tender
Electrical Work/ Equipment
Item Rate
60 days
Chemaguri
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
Yes
14 Sept 2020
27 Sept 2019
6 Nov 2019
27 Sept 2019
1 Nov 2019
27 Sept 2019
Amount
Approach road, Sreedam Road, Bus stand, Burning Ghat, Rudranagar & Mission Road] Supply on hire basis 4.88 mtr. Long 100 mm dia (AV) bottom & 50 mm dia (AV) top salbollah post and erection in different places at Chemaguri and Ramakrishna Mandir Mission Road and two other places as per direction of EIC (Average distance from pole to pole is 20 mtr.)
Supply on hire basis and drawing of L.T. distribution line from medium pressure line as per IE rules and ISS by 50 sq. mm. To 16 sq. mm. PVC single core Aluminium wire and supply of binding wire insulation connection etc. as per direction of EIC on or before 08.01.2020.
Providing on hire basis including supplying, laying and transportation charges of 3.5 core PVC/ XLPE insulated Aluminium un armoured cable for illumination arrangement including dismantling the same after completion of Mela from 08-01-2020 to 17-01-2020
Drawing street light point on the existing PCC poles or salbollah post from different feeder line to generator line as per direction of EIC by supplying hire basis 60 watt lamp holder and shed etc. all other necessary materials required to complete the work from 08.01.2020 to 17.01.2020 = 10 days x 400 pts.
Installation of S.V lamp for street and flood light fixture with S.V. lamp and fixture supply on hire basis including guarding arrangement as per direction of EIC including dismantling the same after Mela from 08.01.2020 to 17.01.2020.
10 days x 160 point (250 watt S.V.)
10 days x 60 point (400 watt S.V.)
Painting D type iron clamp and pole clamp by red oxide paint and fitting fixing the same with existing pole including nuts bolts & washer
Supply and fitting fixing of 2 pin 5 amps [for mobile charger] and 3 pin 15 amps plug point [for spl purpose] on hire basis
Drawing the tube light point on post from different feeder line as per direction of EIC by supplying on hire basis 40 watt tube light fixture complete set from 08.01.2020 to 17.01.2020 = 10 days x 600 pts.
Drawing colored chain light points on bamboo post from different feeder line as per direction of EIC by supplying on hire basis 60 watt bulb, holder, wire etc. including all other necessary materials required for the work complete with guarding arrangement from 08.01.2020 to 17.01.2020= 10 days x 150 point.
Drawing the tube light point on post from different feeder line as per direction of EIC by supplying on hire basis 40 watt tube light fixture complete set incl. guarding arrangement from 08-01-2020 to 17-01-2020 = 10 days x 720 point
Erection of bamboo post on hire basis at different places as per direction of EIC incl. supply of 4” dia. AV. Bamboo post Average distance from pole to pole is 30 ft. from approaching road to rickshaw stand and police camp at Sreedam.
Carrying of 3 Nos. departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 06.1.2019 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. accessories of the temporary Controlling station.
East side of Panchayet office to Sanimandir Supply on hire basis and erection of bamboo post 4.88 M long at different places as per direction of EIC including supply of 4” dia (AV bamboo post (average distance from pole to pole is 30 ft.)
Supply on hire basis and drawing of L.T. distribution line from medium pressure line as per IE rules and ISS by 7/20 single core PVC AL. wire and supply of binding wire insulator connection etc. as per direction of EIC on or befor 08.01.2020.
Drawing the tube light point on bamboo post from different feeder line as per direction of EIC by supplying on hire basis 40 watt tube light fixture complete set (damaged materials will have to be replaced by the agency their own cost) including guarding arrangement from 08.01.2020 to 17.01.2020 = 12 days x 60 pts. = 600 pts.
Lighting Arrangement at 6 Nos Jetty Supply on hire basis 4.88 mtr long 100mm.dia.[av] bottom and 50mm dia [av] top salbollah post and erection in different places of new jetty as per direction of EIC
Supply on hire basis and drawing of LT distribution line from medium pressure line as per IE rules and ISS by 50 sq. mm. to 16 sq. mm. PVC single core Al wire and supply of binding wire insulation connection etc as per direction of EIC on or before 07-01-2020
Installation of SV lamp for street and flood light fixture with 400 watt SV lamp and fixture supply on hire basis including guarding arrangement as per direction of EIC including withdrawing the same after Mela From 08-01-2020 to 17-01-2020 =10 days x 12 point[400 watt SV lamp]
Drawing and fitting fixing of 1000 Watt halogen fixture with lamp at jetty area from 08-01-2020 to 17-01-2020 = 10 days x 12 pts.
Drawing the tube light point on post from different feeder line as per direction of EIC by supplying on hire basis 40 watt tube light fixture complete set from 08-01-2020 to 17-01-2020 = 10 days x 60pts
Drawing colored chain light points on bamboo post from different feeder line as per direction of EIC by supplying on hire basis 60 watt bulb holder wire etc including all other necessary materials required for the work complete including guarding arrangement from 08-01-2020 to 17-01-2020 = 10 days x 240 points
Lighting Arrangement at Bankimnagar Supply on hire basis 4.88 mtr long 100mm.dia.[av] bottom and 50mm dia [av] top salbollah post and erection in different places of new jetty as per direction of EIC[Average distance from pole to pole is 20mtr]
Supply on hire basis and drawing of LT distribution line from medium pressure line as per IE rules and ISS by 50 sq. mm.to 16 sq.mm. PVC single core Al wire and supply of binding wire insulation connection etc as per direction of EIC on or before 07-01-2020
Installation of SV lamp for street and flood light fixture with 400 watt SV lamp and fixture supply on hire basis including guarding arrangement as per direction of EIC including withdrawing the same after mela from 08-01-2020 to 17-01-2020 = 10 days x 10 pts
Drawing the tube light point on post from different feeder line as per direction of EIC by supplying on hire basis 40 watt tube light fixture complete set from 08-01-2020 to 17-01-2020 = 10 days x 15pts
Supplying generating set with controlling panel, main switch, change over switch and necessary battery as per requirement on hire basis and properly installed at different controlling station at main Island as per direction of EIC with foundation and earthing including guarding arrangement complete for 24 hrs. For advance police party from 25-12-2019 to 07-01-2020 = 5 Kw x 14 days
Running and maintenance of generating sets in full load balance with supply of fuel, lubricants, sundries and skilled operation staff and including all other materials required to complete the work with all electrical connection complete. For advance police party from 25-12-2019 to 07-01-2020 = 5 Kw x 14 days x 5 Hrs.
Guarding arrangement for the whole installation which included all sites of Group – A, B, C & D. for the entire period round the clock from 08.01.2020 to 17.01.2020.
Taking out the whole installation of Group A, B, C & D after Mela and sending the departmental Materials to departmental store at Sagar as per direction of EIC.
EMERGENCY ILLUMINATION ARANGEMENT AT 5 NOS JETTY Supply on hire basis and drawing of L.T. distribution line from medium pressure line as per IE rules and ISS by 50 sq. mm. To 16 sq. mm. PVC single core AL. wire and supply of binding wire insulation connection etc. as per direction of EIC on or before 12.01.2020.
Installation of flood light fixture with 400 watt SV lamp and fixture on hire basis including guarding arrangement as per direction of EIC including dismantlinging the same after mela from 12-01-2020 to 15-01-2020 = 4 days x 40 pts
Supply and delivery at site of Calcium Hypoclorite [Ca(OCL)₂] granules with minimum chlorine content 60% to 65% in air tight plastic container. (Make- Shree Rayalaseem Hi Strength Hypo Limited / Hind Pharma / Aquafit / PHE approved) N.B= Test certificate should be submitted at the time of delivery.
Supply of generator set at site on hire basis and properly installed as per direction of EIC on proper foundation as per IE rules including construction of shed as per departmental specification from 08.01.2020 to 17.01.2020 = 10 days x 10 KW x 2 Nos.
Running and maintenance of generator set by supplying of skilled operating staff, fuel, lubricants, sundries and other necessary materials required for proper running of generating set as per direction of EIC from 08.01.2020 to 17.01.2020 = 10 days x 2 hrs. x 2 Nos. x 10 KW
Running and maintenance of. Submersible pump set in 3 (three) shifts, by engaging skilled operating staff including supply of necessary sundries as per direction of EIC from 08.01.2020 to 17.01.2020 = 10 days x 20 hrs.X2 Nos.
Guarding arrangement for the whole installation of the above materials for the entire period round the clock.
Taking out the whole installation as per direction complete
ADD GST @ 12%
Tarun Kumar Bhattacharya
ORIENTAL ENGINEERING CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .