| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.4 CrAccepted-AOC 142 | ₹9.4 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹10.4 Cr+₹99.0 L (10.5%)Rejected-AOC CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹10.4 Cr+₹99.0 L (10.5%) | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹10.5 Cr+₹1.1 Cr (12.0%)Rejected-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹10.5 Cr+₹1.1 Cr (12.0%) | L-3 | Rejected-AOC L_3 |
| 4 | L-4₹10.7 Cr+₹1.3 Cr (13.4%)Rejected-Finance | ₹10.7 Cr+₹1.3 Cr (13.4%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹11.8 Cr+₹2.4 Cr (25.9%)Rejected-Finance | ₹11.8 Cr+₹2.4 Cr (25.9%) | L-5 | Rejected-Finance L-5 |
Tender Value
₹15 Cr
EMD Value
₹30 L
Closing Date
2 Jul 2022, 5:00 pmClosed
Superintending Engineer
Drainage Circle, Aligarh
Construction of Cross and head Regulator at Km. 228.800 of U.G.C. For 43 Cusec water supply to T.H.D.C. Khurja
2022_UPIDC_708461_1
02/SE/2022-2023
Open Tender
Civil Works
Item Wise
365 days
Construction of Cross and head Regulator
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹30 L
SE Drainage circle Aligarh
3 Oct 2022
17 Jun 2022
4 Jul 2022
17 Jun 2022
2 Jul 2022
17 Jun 2022
21 Jun 2022
Amount
Earth work in filling and removing for Ring Bundh of canal with carriage earth up to 1 Km. distance by power transport including all cost of material, Labour and T&P etc. for proper completion of work as directed by Engineer In- charge.
Earth work in cutting for making diversion and back filling the same in ordinary soil with proper ramming, dressing ,mechanicaly compaction including all cost of material, Labour and T&P etc. for proper completion of work as directed by Engineer In- charge.
Dewatering of foundation by 5 BHP including all cost of materials, labour and T&P etc. for proper completion of job as per direction by Engineer in-charge.
Earth work in excavation mixed with dry wet or under water including Ramming and dressing the surface to the required levels slope and also including all lead & lifts.
Supplying and laying ordinary sand in deep areas & below the raft foundation including all cost of material, labour and T&P etc.
Providing and laying Cement concrete M15 (1:2:4) with cement , coarse sand , and 25mm to 10mm stone grit including cost of all material, labour and T&P etc.complete.
Providing and laying porous Cement concrete M15( 1:2:4) with cement and , coarse sand including cost of all material, labour and T&P etc.complete.
Providing and laying R.C.C M25 (1:1:2) with cement , coarse sand , and 10-20mm stone grit including cost of all material, labour and T&P etc.complete.
Providing and laying R.C.C M30 (Design mix) with cement , coarse sand , and 10-20mm stone grit including cost of all material, labour and T&P etc.complete.
Centering and shuttering for R.C.C. work including all cost of material, labour and T&P etc.
Form work for C.C. Block including all cost of material, Labour and T&P etc.
Steel Reinforcement including bending , binding , cutting , and placing at position including all cost of material , labour and T&P etc. complete.
200 MM graded filter of coarse sand below C.C blocks including all cost of material, labour and T&P etc.
200 MM Graded filter of 4-10 mm pea gravel below C.C blocks including all cost of material, labour and T&P etc.
200 MM Graded filter of 10-20 mm pea gravel below C.C blocks including all cost of material, labour and T&P etc.
Supplying and laying Boulder in Apron in bed and side including cost of all material, Labour and T&P etc. complete.
Supplying and laying pebbles filter below C.C. Blocks including cost of all material, Labour and T&P etc. complete.
Supplying and Fixing 75 mm dia P.V.C. pipe 6kg/sq.cm mm dia as drainage spouts in bridge. Including all cost of Material Labour , T&P etc. complete.
Supply of H.D.P.E. Geo bags made of 240 GSM woven fabric confirming to 15351 (2015) of size 1.09x0.69 mtr. Filling of Geo bags with R.B.M. laying and machine sewing with geo material.
Supplying, fixing and extraction of sheet piles driving into the ground for making bundhas and diversion of required depth including all cost of materials cutting, welding , Labour T&P all lead and lifts, cutting forming, fixing and maintaining them in position for proper completion of work as per direction of Engineer in-charge.
Supplying and fixing of diamond(copper) seal in position including cost of all material,Labour and T&P etc. complete
Providing and fixing Rubber water stop for lift joint of 150 mm in position including all cost of material, labour T&P all lead and lifts, cutting, forming, fixing and maintaining them in position for proper completion of work as per direction of Engineer In-charge.
Supplying and laying tar paper bearing on abutment and piers including cost of material , labour T&P all lead and lifts cutting, forming, fixing and maintaining them in position for proper completion of work as per direction of Engineer In-charge. .
Supplying and fixing sheet piles driving into the ground up to required depth including all cost of materials cutting, welding ,painting with bitimen including cost of all materials, Labour T&P etc. for proper completion of work.
Providing and fixing Expansion joint in bridge slab including cost of all material ( Angle iron) M.S. p;ate etc,) cutting, welding, labour and T&P required for completion of work.
Supplying fabricating and erection of structural steel gate, vertical lift crest gates, as per IS 4622 with skin plate stiffeners, ballast weight, guides, embeded parts, sill beam, fitted with stainless steel flat, track beam and sealing frame fitted with stainless steel flat, roller, rubber seals, rope drum hoist as per IS 6938-2005 Electricially operated hoist ( With inbuilt manual operation) including cost of hoisting arrangement and deckinfg etc. complete as per direction of the Engineer In-charge.
Earth work in berm cutting in ordinary soil including all lead and lift the Earth from excavation to be used in filling embenkment ordisposed as spoil bankwth properramming and dressing by manual labour or machine or as directed by Engineer In- charge.
Uprooting jhunds including back filling
Brick on edge lining with 1:3 cement mortor laid on 10 mm thick base plastere including all cost of material, labour and T&P etc. complete.
M/S AJAY KUMAR
Durga Engineers and Earth Movers
M/S ARUN CONSTRUCTION
M/S ASHOK KUMAR
M/S MITTAL BROTHERS ENGINEERS AND
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1139422.xls
BOQ Document • 0.25 MB
100087757.pdf
Tender Document • 1.49 MB
100087761.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .