Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC 57 SECOND STREET KESAVAPURAM MINJUR 601 203 | MINJUR | THIRUVALLUR | TAMIL NADU | 601203 | ₹15.1 L Quoted ₹13.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹14.1 LRejected-AOC PLOT NO 41 T H ROAD KESAVAPURAM MINJUR 601 203 | THIRUVALLUR | TAMIL NADU | 601203 | ₹14.1 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SHARTHI TECKMA CONTRACTS L2 | EZHIL ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Checking, Correction, fine tuning/ matching of oil pressure & valve opening of HP GOVERNING SYSTEM CONTROL RACK ASSEMBLY such as Hydraulic governor (HG), EHG & HYDRAULIC AMPLIFIER, and its Follow-Up Pistons, Starting Device and Load Limiting Device, Over Speed Trip Testing Device and Over Speed Trip Release Device, Low vaccum trip assembly, Extracion valve relay, Extracion NRV, Main Trip Valves, ATT Change Over valve, Hand Trip Valve, CRH NRV Pilot Assembly by disconnecting the connected oil piping’s, complete disassembling of internals in sequence, Cleaning and overhauling, rectification, replacement, reassembling of complete internals in sequence and connecting the oil piping’s. Including the cost of consumables and hire charges for T&Ps. | 3 | Nos | 2,00,000 ₹6 L | 1,98,000 ₹5.9 L |
| 2.00 | Checking, Correction, fine tuning/ matching of oil pressure & valve opening of LP GOVERNING SYSTEM CONTROL RACK ASSEMBLY such as Hydraulic convertor (HG), EHG & and its Follow-Up Pistons, LP bypass limit controller, Low vacuum condenser protection, spray water pressure switch, Pilot valve for spray water injection, stop valve follow pistion1 & 2, control valve pilot, LP bypass control valve Feed back assembly 1 & 2, by disconnecting the connected oil piping’s, complete disassembling of internals in sequence, cleaning and overhauling, rectification, replacement, reassembling of complete internals in sequence and connecting the oil piping’s. Including the cost of consumables and hire charges for T&Ps. | 3 | Nos | 1,90,000 ₹5.7 L | 1,82,000 ₹5.5 L |
| 3.00 | Checking of HP & LP governing system and calibrating the governing characteristics of valves by generating the oils such as Start-up oil, Auxiliary secondary oil and signal oil, HP/IP secondary oil and Trip oil, and confirming the valve operations with as per protocols / standard curves supplied by BHEL. Recording the values. Including the cost of consumables and hire charges for T&Ps. | 3 | Nos | 80,000 ₹2.4 L | 79,000 ₹2.4 L |
Tender Value
Refer Docs
EMD Value
₹16,400
Closing Date
2 Jul 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI Circle R M 25 26 TM Dn Complete overhauling rectification fine tuning replacement reassembling and re commissioning of HP and LP governing racks elements and its accessories MAIN TURBINE GOVERNING SYSTEM
2025_EB_570463_1
CE SE MI NCTPS I 39 25 26
Open Tender
Power/Energy Projects/Products
45 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,400
Yes
27 Apr 2026
19 Jun 2025
3 Jul 2025
19 Jun 2025
2 Jul 2025
19 Jun 2025
Amount
Checking, Correction, fine tuning/ matching of oil pressure & valve opening of HP GOVERNING SYSTEM CONTROL RACK ASSEMBLY such as Hydraulic governor (HG), EHG & HYDRAULIC AMPLIFIER, and its Follow-Up Pistons, Starting Device and Load Limiting Device, Over Speed Trip Testing Device and Over Speed Trip Release Device, Low vaccum trip assembly, Extracion valve relay, Extracion NRV, Main Trip Valves, ATT Change Over valve, Hand Trip Valve, CRH NRV Pilot Assembly by disconnecting the connected oil piping’s, complete disassembling of internals in sequence, Cleaning and overhauling, rectification, replacement, reassembling of complete internals in sequence and connecting the oil piping’s. Including the cost of consumables and hire charges for T&Ps.
Checking, Correction, fine tuning/ matching of oil pressure & valve opening of LP GOVERNING SYSTEM CONTROL RACK ASSEMBLY such as Hydraulic convertor (HG), EHG & and its Follow-Up Pistons, LP bypass limit controller, Low vacuum condenser protection, spray water pressure switch, Pilot valve for spray water injection, stop valve follow pistion1 & 2, control valve pilot, LP bypass control valve Feed back assembly 1 & 2, by disconnecting the connected oil piping’s, complete disassembling of internals in sequence, cleaning and overhauling, rectification, replacement, reassembling of complete internals in sequence and connecting the oil piping’s. Including the cost of consumables and hire charges for T&Ps.
Checking of HP & LP governing system and calibrating the governing characteristics of valves by generating the oils such as Start-up oil, Auxiliary secondary oil and signal oil, HP/IP secondary oil and Trip oil, and confirming the valve operations with as per protocols / standard curves supplied by BHEL. Recording the values. Including the cost of consumables and hire charges for T&Ps.
SHARTHI TECKMA CONTRACTS (BID ID -1375663)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_681517.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid