Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 CrAccepted-AOC B B ROAD BARPETA ASSAM | BARPETA | ASSAM | 781301 | ₹14.2 Cr Quoted ₹13.9 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | Rejected-Technical FATASHIL AMBARI CITY TOWN GUWAHATI P O BHARALUMUKH P S BHARALUMUKH DISTRICT KAMRUP METRO PIN 781009 | KAMRUP METRO | ASSAM | 781009 | - | - | Rejected-Technical Non-Responsive |
| 3 | Rejected-Technical 4 KALABHANGA BARPETA ROAD PO BARPETA ROAD PS BARPETA ROAD BARPETA 78315 | 78315 | - | - | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical H NO 06 ANUPAM PATH P O P S HATIGAON KAMRUP METRO PIN 781038 | KAMRUP METRO | ASSAM | 781038 | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | M/s Macrocosm Builders L1 |
|---|---|---|---|---|
| 1.00 | Planning, Designing, and Construction of RCC framed structure SCHOOL BUILDING (G+1), AT Paschim Barnagar Higher Secondary School, BARPETA DISTRICT, with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 2,204.36 | Sqm | 27,485 ₹6.1 Cr |
| 2.00 | Planning, Designing, and Construction of RCC framed structure SCHOOL BUILDING (Ground Floor Assam Type), " AT HATHINAPUR VIDYAMANDIR HES, BARPETA DISTRICT, with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 2,256.91 | Sqm | 25,480 ₹5.8 Cr |
| 3.00 | Planning, Designing and construction of Civil External development works, Levelling, Earth Filling, Dismantling of Existing Assam Type Building, Internal Road, foothpath, overhead tank, Septic Tank, distribution lines , Borewell, Trence and sewage & drainage pump approval of the same by the Engineer- in-Charge | 1 | Job | 85,00,000 ₹85 L |
| 4.00 | Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station (Including APDCL Load Security fee), CCTV, Access control system, IP Based EPABX system and Emergency Light and Illuminated digital signages with support services & allied facilities by incorporating stipulated specifications, UPS, CCTV SYSTEM, Fire Extinguisher, all services including handing over complete as per scope of work and directions of Engineer In charge. | 1 | Job | 60,34,000 ₹60.3 L |
| 5.00 | Supplying, Installation of Class room, Principal Room, Vice Principal Room, Library, Physics Lab, Chemistry Lab, Biology Lab, Staff Room, Computer Lab, Furniture : Audio Visual System for Smart Class Room, Testing and commissioning including handing over complete as per scope of work and directions of Engineer In charge. | 1 | Job | 64,00,000 ₹64 L |
Tender Value
₹13.5 Cr
EMD Value
₹26.9 L
Closing Date
4 Feb 2025, 2:00 pmClosed
CE, PWD(Bldg), H and E, Assam, Chandmari, Ghy-3
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
Infrastructure Development of 65 Secondary Schools for construction of new School building under NESIDS (OTRI) at (i) Paschim Barnagar Higher Secondary, Sorbhog, (ii) Hathinapur Vidyamandir HES, Bhawanipur under Barpeta District (Gr-2)
2025_PWBNH_42108_1
Tech-II/202/2023/41 Dated Guwahati the 8 January 2025
Open Tender
Civil Works - Building
425 days
Barpeta
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
₹26.9 L
Yes
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
16 Aug 2025
16 Jan 2025
4 Feb 2025
16 Jan 2025
4 Feb 2025
16 Jan 2025
20 Jan 2025
Amount
Planning, Designing, and Construction of RCC framed structure SCHOOL BUILDING (G+1), AT Paschim Barnagar Higher Secondary School, BARPETA DISTRICT, with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction of RCC framed structure SCHOOL BUILDING (Ground Floor Assam Type), " AT HATHINAPUR VIDYAMANDIR HES, BARPETA DISTRICT, with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and construction of Civil External development works, Levelling, Earth Filling, Dismantling of Existing Assam Type Building, Internal Road, foothpath, overhead tank, Septic Tank, distribution lines , Borewell, Trence and sewage & drainage pump approval of the same by the Engineer- in-Charge
Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station (Including APDCL Load Security fee), CCTV, Access control system, IP Based EPABX system and Emergency Light and Illuminated digital signages with support services & allied facilities by incorporating stipulated specifications, UPS, CCTV SYSTEM, Fire Extinguisher, all services including handing over complete as per scope of work and directions of Engineer In charge.
Supplying, Installation of Class room, Principal Room, Vice Principal Room, Library, Physics Lab, Chemistry Lab, Biology Lab, Staff Room, Computer Lab, Furniture : Audio Visual System for Smart Class Room, Testing and commissioning including handing over complete as per scope of work and directions of Engineer In charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid