Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.3 L
EMD Value
₹3,750
Closing Date
11 Sept 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Wildlife Warden Chenab Division,Kishtwar
Kishtwar
Erection of Boundary Pillar at JTCCR Co 47 Bnl Banihal Wildlife Chenab Division Kishtwar under Campa of JTCCR for the year 2021 22
2021_FD_132103_4
NIT 60 Erection of Boundary Pillar
Open Tender
Civil Works
Item Wise
30 days
Banihal
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Wildlife Warden Chenab Division,Kishtwar
₹3,750
Yes
16 Sept 2021
2 Sept 2021
13 Sept 2021
2 Sept 2021
11 Sept 2021
2 Sept 2021
90 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed 80% dense harder soil and 20 % ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work upto plinth level 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Crushed. Incl. all carriages lifts complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal sizeIncl. all carriages lifts complete job.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m Incl. all carriages lifts complete job.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size.Incl. all carriages lifts complete job.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014( Nerolac) Exterior Emulsion paint is recommended.
Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts
sh.farooq ahmed
KHURSHED AHMED
sh. sabzar ahmed gujjar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .