| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC NO 28 KUTHIRAI KATTI STREET KARUNTATTANKUDI THANJAVUR 613 002 | THANJAVUR | THANJAVUR | TAMIL NADU | 613002 | ₹8.5 L | L1 | Accepted-AOC LER |
| 2 | L2₹8.6 LRejected-Finance | ₹8.6 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Sivagurunathan L2 | Ramprasath L1 |
|---|---|---|---|---|---|
| 1.00Construction of RCC slab culvert @ Dharmambal nagar road in Mariyammankovil panchayat. | |||||
| 2.00 | Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B. | 40.27 | Cum | 266.35 ₹10,725.91 | 262.25 ₹10,560.81 |
| 3.00 | Sand filling with good M.Sand including cost and conveyance of all materials to site including watering and compacting etc complete. | 9.76 | Cum | 2,257.35 ₹22,031.74 | 2,253.55 ₹21,994.65 |
| 4.00 | Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete. | 9.76 | Cum | 6,046.35 ₹59,012.38 | 6,042.75 ₹58,977.24 |
| 5.00 | Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Below Basement) | 89.58 | Sqm | 550.35 ₹49,300.35 | 545.95 ₹48,906.20 |
| 6.00 | Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Above Basement) | 61.57 | Sqm | 1,097.35 ₹67,563.84 | 1,093.45 ₹67,323.72 |
| 7.00 | Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete. | 25.75 | Cum | 6,316.35 ₹1.6 L | 6,312.75 ₹1.6 L |
| 8.00 | Cement concrete with (1:2:4) mix using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete. | 32.84 | Cum | 7,337.35 ₹2.4 L | 7,333.75 ₹2.4 L |
| 9.00 | R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc. | 3.31 | Cum | 9,768.35 ₹32,333.24 | 9,764.45 ₹32,320.33 |
| 10.00 | Supply in cost of Fabrication steel centering including and labour chargesfor etc complete. | 0.35 | Mt | 91,861.35 ₹32,610.78 | 91,856.95 ₹32,609.22 |
Updated dates
Tender Value
₹8.7 L
EMD Value
₹8,710
Closing Date
28 Nov 2025, 3:00 pmClosed
Block Development Officer (BP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District - Thanjavur Block - Construction of RCC slab culvert at Dharmambal nagar road in Mariyammankovil panchayat under MLACDS 2025-2026
2025_RDTN_623659_1
Rc.No. 2463/2025/A2 Dated 13.11.2025
Open Tender
Civil Works - Buildings
180 days
Thanjavur
As per Tender bid document
2 documents required · 2 mandatory
₹0
₹8,710
24 Mar 2026
14 Nov 2025
28 Nov 2025
14 Nov 2025
28 Nov 2025
14 Nov 2025
Amount
Construction of RCC slab culvert @ Dharmambal nagar road in Mariyammankovil panchayat.
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good M.Sand including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Below Basement)
Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Above Basement)
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:2:4) mix using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Supply in cost of Fabrication steel centering including and labour chargesfor etc complete.
Supply and fixing of RCC pipe 300mm dia including cost and conveyance of all materials and labour charges etc., complete
Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method).
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sivagurunathan (BID ID -1523451)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_745698.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid