Loading…
Loading…
Tender Value
₹1.7 L
EMD Value
₹3,460
Closing Date
9 Jun 2026, 6:00 pm3d left
DFO Kathua
Office of the Divisional Forest Office Kathua
Installation of Boundary Pillar at Maha Forest of Kathua Forest Range of Forest Division Kathua for the year 2026-27 STATE CAPEX.
2026_FD_310359_2
14 of 2026-27
Open Tender
Civil Works
45 days
as per nit
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
DFO Kathua
₹3,460
Yes
4 Jun 2026
4 Jun 2026
10 Jun 2026
4 Jun 2026
9 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 7.94 | Cum | 479.3 | ₹3,805.64 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.61 | Cum | 4,826.5 | ₹2,944.17 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size | 5.86 | Cum | 5,733.6 | ₹33,598.9 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 2.93 | Cum | 9,395.7 | ₹27,529.4 |
| 5 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position andbinding all complete Cold twisted bars | 137.16 | Kg | 123.2 | ₹16,898.11 |
| 6 | Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014. ( Nerolac) Exterior Emulsion paint is recommended incl carriage complete job. | 23 | Each | 600 | ₹13,800 |
| 7 | Centering and shuttering including strutting propping etc and removal of form work for columns, piersextera, abutments, pillars, posts and struts | 51.3 | Sqm | 628.95 | ₹32,265.14 |
| 8 | Sand av. Distance MT 30 km and HL 3100 M | 4.23 | Cum | 3,396.1 | ₹14,365.5 |
| 9 | Bajri av. Distance MT 30 km and HL 3100 M | 8.46 | Cum | 3,396.1 | ₹28,731.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.20 MB
BOQ_1008586.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid