Loading…
Loading…
Tender Value
₹12.6 L
EMD Value
₹25,280
Closing Date
10 Jul 2026, 6:00 pm4d left
COMMISSIONER
NAGAR PARISHAD SAWAI MADHOPUR
Construction work on the boundary wall of the park located at Hanuman Nagar Housing Board.
2026_DLB_572343_1
3476-01
Open Tender
Civil Works
90 days
SAWAI MADHOPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
COMMISSIONER / MDRSL
₹25,280
Yes
1 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
10 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | based on Ruidp 2023 | - | - | - | - |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | - | cum | 229.5 | - |
| 3 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (6 cement : 6 coarse sand) | 1 | p.cum | 5,400 | ₹5,394.6 |
| 4 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : Cement mortar 1:4 (1 cement : 4 FINE /coarse sand) | - | sqm | 315.5 | - |
| 5 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | cum | 5,910 | - |
| 6 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and including priming coat with cement primer. | - | sqm | 136.5 | - |
| 7 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | - | p.cum | 184.5 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
3476.pdf
Tender Documents • 0.79 MB
BOQ_1018262.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid