Loading…
Loading…
Tender Value
₹12.6 L
EMD Value
₹25,280
Closing Date
10 Jul 2026, 6:00 pmClosed
COMMISSIONER
NAGAR PARISHAD SAWAI MADHOPUR
Construction work on the boundary wall of the park located at Hanuman Nagar Housing Board.
2026_DLB_572343_1
3476-01
Open Tender
Civil Works
Percentage
90 days
SAWAI MADHOPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
COMMISSIONER / MDRSL
₹25,280
Yes
13 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
10 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | based on Ruidp 2023 | - | - | - | - |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | - | cum | 229.5 | - |
| 3 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (6 cement : 6 coarse sand) | 1 | p.cum | 5,400 | ₹5,394.6 |
| 4 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : Cement mortar 1:4 (1 cement : 4 FINE /coarse sand) | - | sqm | 315.5 | - |
| 5 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | cum | 5,910 | - |
| 6 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and including priming coat with cement primer. | - | sqm | 136.5 | - |
| 7 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | - | p.cum | 184.5 | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
3476.pdf
Tender Documents • 0.79 MB
BOQ_1018262.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .