Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹90,950Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹91,470+₹520 (0.57%)Accepted-Finance MAIN ROAD SIDHRA JAMMU | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹92,200+₹1,250 (1.37%)Accepted-Finance BHAGWATI NAGAR JAMMU | 3 | Accepted-Finance Found Eligible |
Tender Value
Refer Docs
Closing Date
17 Aug 2023, 2:00 pmClosed
Executive Engineer, MID Akhnoor Nowshera
Office of Executive Engineer, MID Akhnoor Nowshera
Repairs to 3.5 cusec discharge HC pump , 75 HP 3 phase induction motor with allied works at LIS Badyalachak and repair to 4 cusec discharge 8m head pump at LIS Lehrian.
2023_IFC_225795_1
MID/AN/58
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
7 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer, MID Akhnoor Nowshera
Exempted
Office of Executive Engineer, MID Akhnoor Nowshera
29 Aug 2023
10 Aug 2023
18 Aug 2023
10 Aug 2023
17 Aug 2023
11 Aug 2023
11 Aug 2023
Repair to 3.5 cusec discharge 36 m HC pump unit no. 2 installed at LIS Badyalachak . The job involves decoupling of the pump from motor by unfastening the coupling nuts and bolts by using skilled technicians . The job further involves taking out impeller shaft assembly by unfastening the nuts ,bolts , studs and shifting the same to workshop by using manual labour and mechanical transport . Dismantling of the impeller shaft assembly and separating shaft, impeller and bushes.P/F of 2-Nos. bearings ( 6309) & 1-No bush as per sample. Re-assembling of impeller shaft assembly & shifting back to L.I.S. Greasing of all the parts. Fitment of impeller shaft assembly in the pump at proper position & closing the top cover by p/f of new nuts, bolts, washers and packing. Job also includes providing / fitting of gland packing , greasing work etc. Thereafter coupling with motor, alignment setting, testing of pump on load. Complete job includes the cost of material, labour charges, to and fro carriage charges, hire charges of tools and tackles etc. Complete Job
Repair to 75 HP 3 phase induction motor of pumping unit no. 3 installed at LIS Badyalachak . The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Shifting of the motor to workshop by mechanical transport . Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process.. Assembling of the motor . Shifting the motor back to LIS . Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump , testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges. Complete Job
Repair to 4 cusec discharge 8 m HC pump unit no. 2 installed at LIS Lehrian. The job involves decoupling of the pump from motor by unfastening the coupling nuts and bolts by using skilled technicians . The job further involves taking out impeller shaft assembly by unfastening the nuts ,bolts , studs and shifting the same to workshop by using manual labour and mechanical transport . Dismantling of the impeller shaft assembly and separating shaft, impeller and bushes.P/F of 2-Nos. bearings & 1-No bush as per sample. Re-assembling of impeller shaft assembly & shifting back to L.I.S. Greasing of all the parts. Fitment of impeller shaft assembly in the pump at proper position & closing the top cover by p/f of new nuts, bolts, washers and packing. Job also includes providing / fitting of gland packing , greasing work etc. Thereafter coupling with motor, alignment setting, testing of pump on load. Complete job includes the cost of material, labour charges, to and fro carriage charges, hire charges of tools and tackles etc. Complete Job
M/S TRIKUTA ELECTRICAL AND MECHNICAL WORKS
BEE AAR ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .