Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5,644Accepted-Finance | ₹5,644 | L1 | Accepted-Finance Qualified |
| 2 | L2₹6,498+₹854 (15.1%)Accepted-Finance | ₹6,498+₹854 (15.1%) | L2 | Accepted-Finance Qualified |
| 3 | L3₹6,910+₹1,266 (22.4%)Accepted-Finance | ₹6,910+₹1,266 (22.4%) | L3 | Accepted-Finance Qualified |
| 4 | L4₹6,920+₹1,276 (22.6%)Accepted-Finance | ₹6,920+₹1,276 (22.6%) | L4 | Accepted-Finance Qualified |
| Sl No | Description | Qty | Unit | M/S RAJ ASSOCIATES L2 | SURESH ELECTRICALS AND DEVELOPERS L3 | C B S ENTERPRISES L1 | A K ELECTRICAL ENG WORKS L4 |
|---|---|---|---|---|---|---|---|
| 1.00Specification & Quantity for Carring Out the different Electricity Line Works, For Running E-Nivida under VIP ,Emergency work, Accidental repair work M&R/R&R Scheme in the jurisdiction of EDD-Dibai. | |||||||
| 2.00 | Carriage of S.T. Pole 11 Mtrs. Long/ PCC Pole. 8.5 Mtrs. Long / 9 Mtrs PCC/9 Mtrs STP | 1 | Nos | 1,000 ₹1,000 | 1,100 ₹1,100 | 800 ₹800 Lowest | 1,100 ₹1,100 |
| 3.00 | Carriage of line accessories, ACSR CONDUCTOR / AB CABLE D/P accessories as cross arm M.S. channel, Angle, 11 KV Dise insulator with fitting 11 KV pin insulator with pin etc. | 1 | Qtl | 400 ₹400 | 430 ₹430 | 350 ₹350 Lowest | 390 ₹390 |
| 4.00 | Erection of 11 Mtrs. STP/8.5 Mtrs. PCC pole Replace of Damage pole by new pole. | 1 | Nos | 2,100 ₹2,100 | 2,200 ₹2,200 | 1,800 ₹1,800 Lowest | 2,350 ₹2,350 |
| 5.00 | Fixing erection & grouting of stay set complete with binding & Nozzling of stay wire. | 1 | Nos | 780 ₹780 | 800 ₹800 | 600 ₹600 Lowest | 810 ₹810 |
| 6.00 | Earthing of supports with the help of Earthing rod & GI wire/earth wire. | 1 | Nos | 200 ₹200 | 320 ₹320 | 100 ₹100 Lowest | 220 ₹220 |
| 7.00 | Laying stringing & sagging of WEASEL conductor including opening and reconnection of consumer cable ,binding ,Jumphering including carriage loading & unloading the same from central store BSR J.E store to site of work. | 1 | Mtrs. | 14 ₹14 | 15 ₹15 | 12 ₹12 Lowest | 15 ₹15 |
| 8.00 | Laying stringing & sagging of DOG conductor including opening and reconnection of consumer cable ,binding ,Jumphering including carriage loading & unloading the same from central store BSR J.E store to site of work. | 1 | Mtrs. | 14 ₹14 | 15 ₹15 | 12 ₹12 Lowest | 15 ₹15 |
| 9.00Providing and fixing of the following material by the material as per RESPO Drawing. | |||||||
| 10.00 | PROVIDING AND FIXING LT Pin Clamps ( Flat Size 50*6 mm) | 1 | Nos. | 450 ₹450 | 460 ₹460 | 430 ₹430 Lowest | 430 ₹430 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
16 Jun 2026, 11:00 amClosed
SE, EDC-III BULANDSHAHR
SE, EDC-III BULANDSHAHR
Replacement of damaged PCC, STP poles, straightening of tilted poles and other related works within the jurisdiction of the Electricity Distribution Division Dibai in the event of unforeseen incidents or emergency situations.
2026_PVVNL_1158493_1
28/EDC-III/B/2026-2027
Open Tender
Electrical Works
Lump-sum
30 days
SE, EDC-III BULANDSHAHR
Replacement of damaged PCC, STP poles, straightening of tilted poles and other related works within the jurisdiction of the Electricity Distribution Division Dibai in the event of unforeseen incidents or emergency situations.
2 documents required · 2 mandatory
₹1,180
Yes
SE, EDC-III BULANDSHAHR
₹5,000
Yes
22 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Specification & Quantity for Carring Out the different Electricity Line Works, For Running E-Nivida under VIP ,Emergency work, Accidental repair work M&R/R&R Scheme in the jurisdiction of EDD-Dibai. | - | - | - | - |
| 2 | Carriage of S.T. Pole 11 Mtrs. Long/ PCC Pole. 8.5 Mtrs. Long / 9 Mtrs PCC/9 Mtrs STP | 1 | Nos | - | - |
| 3 | Carriage of line accessories, ACSR CONDUCTOR / AB CABLE D/P accessories as cross arm M.S. channel, Angle, 11 KV Dise insulator with fitting 11 KV pin insulator with pin etc. | 1 | Qtl | - | - |
| 4 | Erection of 11 Mtrs. STP/8.5 Mtrs. PCC pole Replace of Damage pole by new pole. | 1 | Nos | - | - |
| 5 | Fixing erection & grouting of stay set complete with binding & Nozzling of stay wire. | 1 | Nos | - | - |
| 6 | Earthing of supports with the help of Earthing rod & GI wire/earth wire. | 1 | Nos | - | - |
| 7 | Laying stringing & sagging of WEASEL conductor including opening and reconnection of consumer cable ,binding ,Jumphering including carriage loading & unloading the same from central store BSR J.E store to site of work. | 1 | Mtrs. | - | - |
| 8 | Laying stringing & sagging of DOG conductor including opening and reconnection of consumer cable ,binding ,Jumphering including carriage loading & unloading the same from central store BSR J.E store to site of work. | 1 | Mtrs. | - | - |
| 9 | Providing and fixing of the following material by the material as per RESPO Drawing. | - | - | - | - |
| 10 | PROVIDING AND FIXING LT Pin Clamps ( Flat Size 50*6 mm) | 1 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
28NITDY.pdf
Tender Documents • 1.14 MB
BOQ_2171164.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .