| 1 | L1₹86,822Accepted-AOC ST NO 1 AZIMGARH ABOHAR DISTT FAZILKA PUNJAB 152116 | ABOHAR | FAZILKA | PUNJAB | 152116 | L1 | Accepted-AOC Award of Contract the SHIVA CONSTRUCTIONS by the committee for the Lower Bidder than others | |
| 2 | L2₹93,148+₹6,326 (7.29%)Rejected-AOC NULL | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHIVA CONSTRUCTIONS L1 | THE KUNWAR COOP L AND C SOCIETY LTD L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in soil using hydraulic jcb and hydraulic trolley with disposal including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead. | 1 | cum | 65 ₹65 Lowest | 65 ₹65 Lowest |
| 2.00 | Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications. | 65.03 | cum | 7,153.3 ₹7,153.3 Lowest | 7,153.3 ₹7,153.3 Lowest |
| 3.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth. | 19.53 | cum | 3,124.8 ₹3,124.8 Lowest | 3,124.8 ₹3,124.8 Lowest |
| 4.00 | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 1.24 | cum | 260.4 ₹260.4 Lowest | 260.4 ₹260.4 Lowest |
| 5.00 | Laying 1st class brick lining 75 mm thick laid in 1:3 CSM over 10 mm thick cement Plaster 1:3 over 12.5 mm thick cement plaster 1:5 over dressed sub grade (for side slopes) including supply carriage, loading and unloading of material from source to site of work complete in all respects as per PWD specification. | 87.29 | sqm | 69,832 ₹69,832 Lowest | 74,196.5 ₹74,196.5 |
| 6.00 | Laying 1st class brick on edge coping 229 mm wide and 115 mm thick in cement sand mortar 1:3 complete in all respects as per PWD specification. | 42.98 | rmt | 6,876.8 ₹6,876.8 Lowest | 7,091.7 ₹7,091.7 |
| 7.00 | Extra allowance for providing templates in curved portions of lining. | 41.29 | sqm | 578.06 ₹578.06 Lowest | 578.06 ₹578.06 Lowest |
| 8.00 | Extra allowance for scaffolding in lining for side slopes only. | 53.04 | sqm | 742.56 ₹742.56 Lowest | 742.56 ₹742.56 Lowest |
| 9.00 | Supply of labour for clearing nakka removal of EC Bags from patch site. (DC rate) | 1 | Nos | 501 ₹501 Lowest | 501 ₹501 Lowest |
| 10.00 | Any other item | 1 | CSR+SP | - | - |
Tender Value
₹82,759
EMD Value
₹1,655
Closing Date
30 Dec 2025, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Abohar Canal and Ground Water
O/o Executive Engineer, Abohar Canal Ground Water Division , Water Resources, Punjab, Abohar
Estimate for Permanent Plugging of breach by Brick Lining of RD 22900 L, RD 23700 L R and RD 27450 L R of Karampatti Minor
2025_WR_155881_3
E-Tendering Notice No.20/Abohar Canal Ground Water Division /2025-26 Dated 18/12/2025
Open Tender
Civil Works - Canal
Item Rate
Sri Muktsar Sahib
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
₹1,655
Yes
19 Jan 2026
18 Dec 2025
30 Dec 2025
19 Dec 2025
30 Dec 2025
19 Dec 2025
Excavation in soil using hydraulic jcb and hydraulic trolley with disposal including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead.
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications.
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth.
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
Laying 1st class brick lining 75 mm thick laid in 1:3 CSM over 10 mm thick cement Plaster 1:3 over 12.5 mm thick cement plaster 1:5 over dressed sub grade (for side slopes) including supply carriage, loading and unloading of material from source to site of work complete in all respects as per PWD specification.
Laying 1st class brick on edge coping 229 mm wide and 115 mm thick in cement sand mortar 1:3 complete in all respects as per PWD specification.
Extra allowance for providing templates in curved portions of lining.
Extra allowance for scaffolding in lining for side slopes only.
Supply of labour for clearing nakka removal of EC Bags from patch site. (DC rate)
Any other item
THE KUNWAR COOP L AND C SOCIETY LTD (BID ID -707564)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
Tendernotice_2.pdf
PDF • 0.12 MB
TB03.xls
Tender Documents • 0.05 MB
BOQ_316371.xls
BOQ • 0.28 MB
SBD.pdf
Additional Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .