Tender Value
₹39.3 L
EMD Value
₹78,500
Closing Date
31 Aug 2026, 3:00 pm3d left
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Station Development
ELEC. GENL
15 conditions · 4 needing a document upload
As per Note (ii) of 5. Bid security Part I of Instructions to Tenderers(ITT) of GCC April 2022, "Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security detailed above". Bid security exemption cannot be claimed with Documents other than this and such offers will be summarily rejected.
Annexure VI B format of GCC April 2022 attested by Chartered Accountant has to be attached Mandatorily by tenderer along with Audited Balance sheet if the Advertised value of tender is Rs. 50 Lakhs and more.
Para 14 of Instructions to Tenderers of GCC April 2022 must be adhered by Tenderer and all the documents mentioned there has to be attached mandatorily according to the type of Constitution of business like Sole proprietorship, Company, LLP etc.
The contractor shall hold a valid Electrical Contractor License issued by the competent State Electrical Licensing Board / Chief Electrical Inspectorate, duly authorizing the execution of Low Tension (LT)electrical installation works up to 650 Volts, including 415 V three phase systems. Submission of a valid electrical contractor license alongwith the bid is mandatory. Failure to upload the same shall render the offer liable for rejection.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
33 conditions · 2 needing a document upload
The Stores materials which are supplied by Railways shall be collected from SSE/E/Works/SA stores duly transporting the same to the site by own cost borne by the contractor only. The released Railway materials if any should be handed over to the maintenance concerned SSE/Power stores duly getting forwarding acknowledgement from SSE/E/Works concerned.
I/We also hereby agree to abide by the updated Regulations of Tendersand Contracts and General Conditions of Contract issued by theEngineering Department of Indian Railways along with correction slipsissued from time to time and to carryout the work according to the SpecialConditions of Contract and specifications of materials and works as laiddown by Railway in the Annexed Special Conditions / Specifications,Schedule of Work for the present contract.
All rates quoted in the tenders shall be deemed to be inclusive of CGST,SGST, IGST etc., payable by the contractor to the Government or anypublic body and no additional amount/rate or claim will be entertained onthis account by the Railways. Also no claim whatsoever will be accepted byRailways on account of revision of tax rates, new taxes of statutory natureby State/Central Govt.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract, with all correction slips up-to- date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions/Specifications, Schedule of Rates with all correction slips up to date for the present contract
I/We have read the various conditions to tender attached hereto and agree to abide by the said conditions
I/We also agree to keep this tender open for acceptance for a period of 60 days from the date fixed for opening the same
I/We offer to do the work for Divisional Electrical Engineer, GENERAL, Salem Division, Salem, at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within the period of completion stipulated in the tender document, from the date of commencement of work of the tender. The amount as stipulated in the tender document is herewith forwarded as Earnest Money. Full value of the earnest Money shall stand forfeited without prejudice to any other right or remedies in case my/our Tender is accepted and if :(a) I/We do not execute the contract documents as stipulated in performance guarantee clause of GCC 20222 as detailed in general instructions.(b) I/We do not commence the work within seven days after receipt of LOA/orders to that effect.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
The Contractor shall submit a statement to the effect that noretired Engineer or retired Gazetted Officer is associated withthe tenderer as per Appendix-D. Tenders without the informationabove referred to or a statement to the effect that no suchretired Engineer or retired Gazetted Officer is so associated withthe tenderer, as the case may be, shall be rejected.
All the tenderers/Contractors have to deposit full earnest money and tender document cost as stipulated for the tender, through online modes as permitted in IREPS application through multiple banks net banking, debit and credit cards only. On failing which offer will be summarily rejected.
The Tenderer should submit a copy of GST/PAN and NEFT Form.
Payment of Security Deposit/EMD and Tender form cost should be made on line only.
GCC 2022- All GCC clauses (updated including with all correction slips on date) are applicable.
i)For all the tenders having advertised cost of Rs. 10 lakh or above, thecontractor shall have the option to take payment from Railways through aletter of credit (LC) arrangement. (ii)This option of taking payment through LCarrangement has to be exercised in IREPS (Indian Railway ElectronicProcurement System - the e-application on which tenders are called byRailways) by the tenderer at the time of bidding itself, and the tenderer shallaffirm having read over and agreed to the terms and conditions of the LCoption.(iii)The option so exercised, shall be an integral part of the bidder'soffer.(iv)The above option of taking payment through LC arrangement, onceexercised by tenderer at the time of bidding, shall be final and no change shallbe permitted, thereafter, during execution of contract.(v)In case tenderer optsfor payment through LC, following shall be the procedure to deal release ofpayment through LC:(a)The LC shall be a sight LC.(b)The contractor shallselect his Advising/Negotiating bank for LC. The incidental cost towards issueof LC and its operation thereof shall be borne by the contractor.(c)SBI, NewDelhi, Main Branch will be the nodal branch for issue of LCs based on onlinerequests received from Railway Accounts Units for tenders opened in financialyear 2019-20. SBI branches where the respective Railway Accounts Office hasits Account (local SBI branch) will be the issuance/reimbursing branch for LCissued under this arrangement. The Bank shall remain same for this tender tillcompletion of contract. The incidental cost @ 0.15 % per annum of LC value,towards issue of LC and operation thereof shall be borne by the contractorand shall be recovered from his bills.(d)The LC shall be opened initially forduration of 180 to 365 days in consultation with contractor. The LC shall beextended time to time as per the progress of the contract, on the request ofthe contractor. The value of LC to be opened initially as well as extendedthereafter shall be finalised by the engineer in consultation with the contractoron the basis of expected progress of work.(e)The LC terms and conditionsshall inter-alia indemnify and save harmless the Railway from and against alllosses, claims and demands of every nature and description brought orrecovered against the Railways by reason of any act or omission of thecontractor, his agents or employees, in relation to the Letter of Credit (LC). All sums payable/borne by Railways on this account shall be considered asreasonable compensation and paid by Contractor.
(f)The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank. (g)The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation. (h)The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways. (i)On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch). (j)The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill. (k)The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch). (l)The contractor's bank (advising bank) shall submit the documents to the Railways Bank (Local SBI Branch). (m)The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account. (n)Any number of bills can be dealt within one LC, provided the sum total of payments to contractor is within the amount for which LC has been opened. (o)The LC shall shall be closed after the release of final payment including PVC amount, if any, to the contractor. (p)The release of performance guarantee or security deposit shall be dealt directly by Railway with the contractor i.e., not through LC
Deployment of Qualified Engineers at Work Sites by theContractor - TheContractor shall employ 1 No. of qualifiedGraduate Engineer for works Rs. 200Lakh or more and 1 No. ofDiploma Engineer for works costing more than Rs. 25Lakh, butless than Rs 200 Lakh
Salem Division- Provision of Soft upgrades in connection with Amrit Bharat Station Scheme phase-I and Phase-II at Tiruppur (TUP) Railway station (Balance of works)- Electrical Arrangements.
SA-E10-2026-27-W1~SR
SA-E10-2026-27-W1
Open
Works - General
6 Months
Salem, Tamil Nadu
₹0
₹78,500
7 Aug 2026
7 Aug 2026
17 Aug 2026
168 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 8,79,368 | ||
| — | 200.00 | — | — | ||
| Supply and fixing of Cable encasing pipe of 'B' class GI pipes 50mm Dia conforming to IS 1239,part 1 (2004) including one number of clamp made out of MS flat of 40mm x 6mm size, one per meter length of pipe and cable sealing compound on open end where ever required as directed by Engineer in charge at site. | — | — | — | 1,40,000 | |
| — | 75.00 | — | — | ||
| Supply and laying of 6 SWG GI wire along with the LTUG Cable, for earth continuity confirming to IS 12776 complete in an approved manner and as directed by Engineer in charge at site. | — | — | — | 2,775 | |
| — | 4.00 | — | — | ||
| Supply and fixing of cable route indicator made of cast iron plate type as per specification in drawing No. CEE/CN/MS/11-2004 complete in an approved manner and as directed by Engineer in charge at site. | — | — | — | 2,200 | |
| — | 75.00 | — | — | ||
| Labour charges for laying, termination and connection, testing and commissioning of LTUG power cables of sizes above 50 sq.mm and up to 240 sq.mm, in excavated trenches/on building walls/sheds/shelters etc., including dressing, routing, cutting, stripping and termination of cable ends with suitable aluminium crimping sockets/lugs and single-compression type cable glands, complete with all necessary accessories, tools and labour, in accordance with IS 1255 and in an approved manner, as directed by the Engineer-in-Charge at site. Note: Required LTUG cables shall be supplied by Railways. | — | — | — | 3,750 | |
| — | 400.00 | — | — | ||
| Supply and running of AerialMains on the roof truss by 4numbers of PVC insulated coppercables of size 7/16 SWGconforming to IS.No:694, 1100 Vgrade, and 1 number of 8 SWGsolid electrolytic copper wire,including fixing (4 Nos. of coppercables each of 1 m & 1 no. of 8SWG electrolytic copper wire of 1m length are taken as 1 m formeasurement purpose) | — | — | — | 2,65,200 | |
| — | 85.00 | — | — | ||
| Supply ,Fabrication & Fixing of MS bracket made up of 40 x 12 mm flat including fasteners, pin/shackle insulator etc of suitable size to hold 4 cables and one earth wire over the earth stud as per Drg No: CEE/CN/MS/15-2004 in an approved manner and as directed by Engineer incharge at Site | — | — | — | 40,460 | |
| — | 316.80 | — | — | ||
| Supply and fixing of PVC conduits of 25mm Dia confirming to IS:9537/P3/1983 or latest(ISI Marked) with wall thickness not less than 2.0 mm, all accessories like bend, junction box etc., on existing wall/stanchion/portal/column and clamped at regular intervals as directed by Engineer in charge at site. | — | — | — | 19,008 | |
| — | 94.00 | — | — | ||
| Supply and wiring includingtermination for lights, fans andcalling bell points etc. by 3 nos. of1.5 sqmm PVC insulated flexiblecopper cable, conforming toIS.No: 694, 1100 V grade,through existing PVC pipesalready laid including one Greencolor wire for earth , three plateceiling rose and other accessories.(Up to 3 m long points). | — | — | — | 33,370 | |
| — | 67.00 | — | — | ||
| Supply and wiring includingtermination for lights, fans andcalling bell points etc. by 3 nos. of1.5 sqmm PVC insulated flexiblecopper cable, conforming toIS.No: 694, 1100 V grade,through existing PVC pipesalready laid including one Greencolor wire for earth, three plateceiling rose and other accessories.(Above 3 m and up to andincluding 7 m long points). | — | — | — | 32,495 | |
| — | 7.00 | — | — | ||
| Supply at site, fixing, testing and commissioning of 08 way modular switch box with concealed metallic flush box as base, mounting plate (modular white plate) confirming to latest IS specification complete in an approved manner. The boxes are to be fixed firmly after doing the following works at the location where the boxes are to be fixed: (1) Required opening for fixing the modular metallic switch box to be made by cutting the wall without causing major damage to wall (2) Unwanted projections are to be chipped and the wall surface is to be made even, (3) The wall surfaceis to be plastered to the present level of the wall surrounding the board. (4) The gap between box and wall surface to be filled with suitable filling material. | — | — | — | 2,590 | |
| — | 14.00 | — | — | ||
| Supply at site, fixing, testing and commissioning of 06 way modular switch box with concealed metallic flush box as base, mounting plate (modular white plate) confirming to latest IS specification complete in an approved manner. The boxes are to be fixed firmly after doing the following works at the location where the boxes are to be fixed:(1) Required opening for fixing the modular metallic switch box to be made by cutting the wall without causing major damage to wall (2)Unwanted projections are to be chipped and the wall surface is to be made even, (3) The wall surface is to be plastered to the present level of the wall surrounding the board. (4) The gap between box and wall surface to be filled with suitable filling material. | — | — | — | 3,542 | |
| — | 28.00 | — | — | ||
| Supply at site, fixing, testing and commissioning of 04 way modular switch box with concealed metallic flush box as base, mounting plate (modular white plate) confirming to latest IS specification complete in an approved manner. The boxes are to be fixed firmly after doing the following works at the location where the boxes are to be fixed:(1) Required opening for fixing the modular metallic switch box to be made by cutting the wall without causing major damage to wall (2)Unwanted projections are to be chipped and the wall surface is to be made even, (3) The wall surface is to be plastered to the present level of the wall surrounding the board. (4) The gap between box and wall surface to be filled with suitable filling material. | — | — | — | 6,440 | |
| — | 19.00 | — | — | ||
| Supply at site, fixing, testing and commissioning of 1 way 16A modular switch confirming to latest IS specification complete on the appropriate modular switch boxes alreadyerected including internal wiring connection in the modular switch box complete in an approved manner as per the section in charge's instruction. | — | — | — | 2,185 | |
| — | 1.00 | — | — | ||
| Supply at site, fixing, testing and commissioning of modular type socket 16Asocket,5/3Pin, flush confirming to latest IS specification complete on the appropriate modular boxes already erected including internal wiring connection by 4.0sqmm PVC insulated single core copper conductorand earth connection to earth terminal in switch board in an approved manner as per the section incharge's instruction. | — | — | — | 160 | |
| — | 71.00 | — | — | ||
| Supply at site, fixing, testing and commissioning of Dummy plate suitable for modular box mentioned in the schedule No 10-12; wherever required with necessary fixing arrangements in approved manner as directed by the Engineer in-charge at site. | — | — | — | 1,988 | |
| — | 50.00 | — | — | ||
| Supply, Fixing, testing and commissioning of LED Batten light with complete fixtures having 20W with available LED Efficacy of minimum 125 (Lumen / Watt), Color Temperature (in K) of 6500 (Cool white), Aluminum extruded housing, with Inbuilt Driver/Control gear, Ingress Protection of IP-20, Operating Voltage range of 100 to 300 V, Frequency 50 Hz with minimum 50000 burning hours and SPD> 4kV and above. The fitting shall be fixed with Round block with patterns on side wall/ceiling with wiring by 3C x 1.0 sqmm PVC insulated & sheathed round flexible copper cable in an approved manner as directed by Engineer in charge at site. The Warranty for the LED Light fittingwill be 5 years and the payment condition will be followed as per Special condition of contract para 3.7. | — | — | — | 22,650 | |
| — | 29.00 | — | — | ||
| Supply, Erection, Testing andcommissioning of Recess Mounted15W LED Down light, Octane LEDRound Panel similar to Havellsmake ModelNo.LHEBADP5IZ1W015. Fittingshall be fixed on ceiling includingwiring by 3 C x 1.0 sqmm PVCinsulated & sheathed roundflexible copper cable in anapproved manner as directed bythe Engineer in charge at site. | — | — | — | 39,005 | |
| — | 2.00 | — | — | ||
| Supply, erection, testing,commissioning of 20 W 1'x1' LEDsquare fittings with suitable accessories for mounting. Thefixture should be rigid, themounting should be surface typeon ceiling and operating voltagerange of 100-300 V AC supply,frequency of 50 Hz +/-5% with similar to PHILIPS make model NoSM200CLED16S 6500 PSU OD WH.The Warranty for the LED Light fitting will be 5 years and the payment condition will be followed as per Special conditions of contract para 3.7. | — | — | — | 2,662 | |
| — | 10.00 | — | — | ||
| Supply and fixing of Energy Efficient BLDC Ceiling Fans of 28 Watts maximum rated power consumption at full speed, complete with electronic controller, conforming to IS 374:2019 / IEC 60335-2-80 and BEE 5-Star Rating requirements. The fan shall be of 1200 mm sweep size, capable of delivering a minimum 230 CMM air delivery, with a service value of not less than 8.0 CMM/Watt. The BLDC motor shall be electronically commutated, suitable for operation on 230 V ±10%, 50 Hz AC supply, with a wide operating voltage range of 140 V to 280 V and a power factor of 0.90. The noise level at maximum speed shall not exceed 60 dB.The item includes supply and fixing complete with aerodynamically balanced aluminium/ABS blades, electronic controller, canopy set, and down rod of length between 3 feet and 5 feet, as required at site, including all accessories, testing and commissioning, fixed in an approved manner and as directed by the Engineer-in-Charge. The fan shall be covered under a minimum 3 (three) years warranty from the date of commissioning, covering motor, electronic controller, and all associated components. | — | — | — | 48,000 | |
| — | 9.00 | — | — | ||
| Supply, fixing, testing and commissioning of 200 mm sweep BEE 5-Star rated Exhaust Fan of maximum rated power consumption not exceeding 40 Watts, suitable for operation on 230 V, 50 Hz single-phase AC supply, complete with all accessories.The work shall include fixing of the exhaust fan in the already provided ventilator / wall opening, fixing of frame/grill as required, and making good the edges with minor plastering only if required, without any fresh wall cutting. The item also includes wiring with 3-core x 1.0 sq.mm PVC insulated and PVC sheathed copper flexible copper cable, including terminations and connections, complete in all respects, tested and commissioned, fixed in an approved manner and as directed by the Engineer-in-Charge. | — | — | — | 25,407 | |
| — | 20.00 | — | — | ||
| Removal of existing Lamp standard post /Rail post by cutting at a depth of 0.50 metre below ground level including breaking of cement concrete and refilling with all accessories including transportation to railwaystore and stocking with proper challan. | — | — | — | 24,000 | |
| — | 200.00 | — | — | ||
| Supply and installation of Cable tray of Size 300mmx50mm height using50x50x6mm angles of perforated cable trays with perforation not more than17.5% fabricated out of Mild steel conforming to IS 2062/1079 and Hot dip galvanized as perIS2629/4759(galvanizing not less than80 microns) in convenient sections, jointed with connectors complete as per specification mentioned in Annexure-I and as desired by the Engineer-in charge at site. | — | — | — | 1,40,200 | |
| — | 1.00 | — | — | ||
| Supply at site, erection, testing & commissioning of vertical Flush/wall mounting type ,powder coated sheet steel , TPN 8 Way distribution board phosphatised and powder coated, double door with supply and fixing of 1 Nos. of 63 amps FP RCBO with 10 KA short circuit capacity and 30mA sensitivity, as incoming control with 3 Nos. of 6-32 amps TP MCBs and 12 nos of 6-32A SP MCB with 10 KA breaking capacity as outgoing control, including internal wiring by suitable wire and incoming cable termination using suitable terminal block with suitable cable gland, earthing / neutral din channel complete with all accessories duly making necessary opening on the wall and masonry work for controlling power/lighting/fan circuits in each building in an approved manner as directed by the section in charge at site. Note: 1.Bi-metallic washers must be provided for AL & Cu joints and for others GI bolts, Nuts & washers must be used. 2.Cable termination shall be using GI bolts & nutswith flat and spring washers & lugs invariably. 3. Board shall be fixed in concealed manner. | — | — | — | 17,431 | |
| — | 1.00 | — | — | ||
| Supply and fixing of TPN Switch Disconnector Fuse of 63 A capacity front operated,cubicle type with HRC fuse links conforming to IS/IEC:60947-3 in the metallic enclosure complete inan approved manner and as directed by Engineer in charge at site. | — | — | — | 3,850 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender Booklet
ATTACHMENT
GICableTraySpecification.pdf
ATTACHMENT
Drawings_I_merged.pdf
ATTACHMENT
I_CT_GCC-
ATTACHMENT
dbannexureTUPsoftupgrades_1.pdf Annexure II for DB
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
dbannexureTUPsoftupgrades_1.pdf
ATTACHMENT
TenderDocument-below50LakhsPL.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].