Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PRASAD V L1 |
|---|---|---|---|---|
| 1.01 | Loading&unloading of 9m PSC pole | 8 | Each | 4,800 ₹5,664 Lowest |
| 2.01 | Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground | 8 | per pit | 6,000 ₹7,080 Lowest |
| 3.01 | Erection of 9m PSC pole in Normal Ground | 8 | per pole | 6,400 ₹7,552 Lowest |
| 4.01 | Transportation of 9m PSC pole from road side to pole pit upto 2KM | 8 | Each Pole | 6,400 ₹7,552 Lowest |
| 5.01 | Erection of V X arm 4.5 feet | 6 | Each | 2,400 ₹2,832 Lowest |
| 6.01 | Fixing of HT/LT TI fittings | 6 | Each | 600 ₹708 Lowest |
| 7.01 | Erection of Tapping channel X arm | 4 | Per loc | 1,400 ₹1,652 Lowest |
| 8.01 | Fixing of HT pin insulator | 15 | Each | 1,125 ₹1,327.5 Lowest |
| 9.01 | Fixing of HT strain disc 11KV | 24 | per | 4,800 ₹5,664 Lowest |
| 10.01 | Fixing of LT S phase cross arm | 4 | per cross arm | 600 ₹708 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,812
Closing Date
23 Sept 2026, 2:00 pmClosed
EE/TKY
TNEB TKY
Improvement estimate for improving the tailend voltage in Samivilai SS 100 KVA at Samivilai providing 1no 63 KVA Addl Distribution Transformer in 11 KV Kothanalloor # under Moolachel Section
2026_EB_702778_1
EE/D/TKY/ETW 24/26-27,Dt.09.09.2026
Open Tender
Electrical Works
Works
90 days
EE/TKY
as specified tender
3 documents required · 3 mandatory
₹0
₹2,812
28 Sept 2026
9 Sept 2026
24 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
10 Sept 2026 - 23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Loading&unloading of 9m PSC pole | 8 | Each | - | - |
| 2.01 | Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground | 8 | per pit | - | - |
| 3.01 | Erection of 9m PSC pole in Normal Ground | 8 | per pole | - | - |
| 4.01 | Transportation of 9m PSC pole from road side to pole pit upto 2KM | 8 | Each Pole | - | - |
| 5.01 | Erection of V X arm 4.5 feet | 6 | Each | - | - |
| 6.01 | Fixing of HT/LT TI fittings | 6 | Each | - | - |
| 7.01 | Erection of Tapping channel X arm | 4 | Per loc | - | - |
| 8.01 | Fixing of HT pin insulator | 15 | Each | - | - |
| 9.01 | Fixing of HT strain disc 11KV | 24 | per | - | - |
| 10.01 | Fixing of LT S phase cross arm | 4 | per cross arm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 1.54 MB
BOQ_844839.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .