| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC | ₹4.7 Cr Quoted ₹5.2 Cr | L1 | Accepted-AOC Accept due to lower rate in BOQ |
| 2 | L2₹5.2 Cr+₹4.9 L (0.95%)Rejected-Finance | ₹5.2 Cr+₹4.9 L (0.95%) | L2 | Rejected-Finance Reject due to higher rate |
| 3 | L3₹5.3 Cr+₹10.8 L (2.09%)Rejected-Finance | ₹5.3 Cr+₹10.8 L (2.09%) | L3 | Rejected-Finance Reject due to higher rate |
| 4 | Rejected-Technical ANWALKHEDA MR | - | - | Rejected-Technical Rejected Due to SBD Evaluation |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected Due to SBD Evaluation |
Tender Value
₹5.4 Cr
EMD Value
₹10.8 L
Closing Date
20 Mar 2020, 5:00 pmClosed
Superintending Engineer
BSR Circle, PWD, Bulandshahr
Widening and Strengthening work of Mehndipur Bhole Ka Mandir to Falaida bangar hote hue Baghpur Haryana border (ODR) in Gautambudhnagar.
2020_CEMRT_448468_1
2366/96M(IV)-BSR CIRCLE/2019-20 DATE 19-02-2020
Open Tender
Civil Works - Roads
Item Rate
270 days
Gautambudhnagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
Executive Engineer, PD, PWD, Gautambudhnagar
₹10.8 L
Bulandshahr
16 Jul 2020
14 Mar 2020
21 Mar 2020
14 Mar 2020
20 Mar 2020
14 Mar 2020
17 Mar 2020
Amount
Construction of Embakment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 and MoRT&H Clause 305 . Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirments of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000 m including all cost of labour, T&P, Machinery material etc as per direction of E/I and MoRT&H Clause 301, including all type of taxes, cess etc but excluding GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Including all cost of labour, T&P, Machinery material etc as per direction of E/I and MoRT&H Clause 304, including all type of taxes, cess etc but excluding GST.
Providing, laying, spreading and compacting stone aggregates of water bound macadam Grading-III specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. MoRT&H Specification clause 404 (Laying in 7.5 cm Layers) including cost of all material, labour, T &P including all taxes, royalty, labour cess but excluding GST
Dismantling of Interlocking Tile road pavment Sortig the dismentaled material, disposal of unserviceable material. Including cost of all material, labour, T &P including all taxes, royalty, labour cess but excluding GST. as per MORTH. 202.(ii)D
Construction granular sub-base (GSB) grade 1 by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibrator rollar to achieve desired density complete. as per MORTH 401, including cost of all material, labour, T &P including all taxes, royalty, labour cess but excluding GST
Providing, laying, spreading and compacting graded stone aggregate to Stablized (3.5% Emulsion & 1% OPC cement) wet mix macadam specifications including premixing the material with at OMC in machenical mix plant carriage of mix material by tipper to site laying in uniform layers of each 100mm thick with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH 403 . Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Providing and applying tack coat with Bitumen V.G.-10 using presure distributor at the rate of 0.30 kg per sqm on the prepared granular/Painted surfaces cleaned with Mechnical broom as per Technical Specification Clause 503. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Providing & laying bituminous concrete Grading-II with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregate of specified grading premixed with bitumenious (VG-30) binder @ 5.4% of mix and filler, transporting the hot mix to work site. Laying With a hydrostatic paver finisher with senser control to the required grade,level and alignment,rolling with smooth wheeled, vibratory and tandem rollar to achieve the desired compaction. As per MORTH Specification clause 509. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Providing laying spreading and compecting graded stone aggregate WMM specification including premixing the material with at OMC in machenical mix plant carriage of mix material by tipper to site laying in uniform layers of each 100mm thick with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Construction of un-reinforced, dowel jointed, plain cement concret pavement thickness as per design over a prepared sub base with 43 grade cement clause no.1501.22 1:1 1/2:3 coarse and fine sand conferming to IS 383 maximum size of aggregrate not exceeding size of 25 mm mixed in a concreat mixture of not less then 0.2 cum capacity and leaid ing approved fixed side form work ( steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing). Spreading the concrete with shovels, rekes, compected using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips primer, sealant, curing of concrete slabs for 14-day, curing compound (Where specified) and water fifnishing to lines and grade as per drawing and Technical Specification clause 1501. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Supply and laying of NP-3 s/s 600mm dia Hume pipe culvert including cost of hume pipe, cartage, fixing of proper alignment complete With parapit Walls etc. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Supply and laying of NP-3 s/s 1000mm dia Hume pipe culvert including cost of hume pipe, cartage, fixing of proper alignment complete With parapit Walls etc. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Cement concrete with 4cm gauge approved stone Grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of the work.including cost of all material, labour, T &P including all taxes, royalty, labour cess complete (For minor Bridge/ Culverts) and as per direction of Engineer in charge. But Excluding GST.
Cement concrete with 2cm gauge approved stone Grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work.including cost of all material, labour, T &P including all taxes, royalty, labour cess complete (For minor Bridge/ Culverts) and as per direction of Engineer in charge.But Excluding GST.
M-150 Brick work including necessary cutting and moulding of brick as required in proportion of 1:3 ( 1cement and 3 Coarse sand) including supply of all material, labour, T&P etc required for completion of the work including cost of all material, labour, T &P including all taxes, royalty, labour cess complete (For minor Bridge/ Culverts) and as per direction of Engineer in charge. But Excluding GST. As per S.I. No. 305(a)
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Jeet Construction
Raja contractors & engineers
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .