Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.3 LAccepted-AOC JHOLUNG BAZAR JALDHAKA | ₹44.3 L | L1 | Accepted-AOC Qualified |
| 2 | L2₹45.2 L+₹90,924.20 (2.05%)Rejected-AOC | ₹45.2 L+₹90,924.20 (2.05%) | L2 | Rejected-AOC Qualified |
| 3 | L3₹45.7 L+₹1.4 L (3.05%)Rejected-AOC JHOLUNG BAZAR JALDHAKA | ₹45.7 L+₹1.4 L (3.05%) | L3 | Rejected-AOC Qualified |
Tender Value
₹44.4 L
EMD Value
₹88,707
Closing Date
18 Mar 2026, 6:00 pmClosed
EXECUTIVE ENGINEER, GED
OFFICE OF THE EXECUTIVE ENGINEER,PARIJAT GUEST HOUSE,2ND FLOOR,P.O-FAGU,GORUBATHAN,GTA
Construction of single (1) unit medical office quarter , building at Jaldhaka PHC, Gorubathan Block, Kalimpong.
2026_GTA_1013400_7
GTA/EE/ GED / NIeT-12(1st Call)/e-Tender/2025-26
Open Tender
CIVIL WORKS
Percentage
GORUBATHAN
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹88,707
Yes
25 Jun 2026
24 Feb 2026
21 Mar 2026
24 Feb 2026
18 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation for additional depth beyond 1.5M | 305.67 | cu.M | 119.27 | ₹36,457.26 |
| 2 | Plum concrete work with 40% cement concrete with 30mm down graded stone metal and 60% stone boulder of size 150mm and above, placed in position as directed excluding shuttering if any.
(1:3:6) proportion | 148.68 | Cu.M | 3,964.8 | ₹5,89,486.46 |
| 3 | Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications. | 102 | sq.m | 117 | ₹11,934 |
| 4 | Hire and labour charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
25 mm to 30 mm shuttering without staging in foundation
Ground floor - Foundation & Plinth | 202.89 | sq.m | 209 | ₹42,404.01 |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150mm including watering and ramming etc. layer by layer complete.
With earth obtained from excavation of foundation | 45.42 | cu.M | 77.54 | ₹3,521.87 |
| 6 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal,loading into truck and cleaning the site in all respect as per direction of Engineer in charge. | 260.25 | cu.M | 166 | ₹43,201.5 |
| 7 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
without rolling but including ramming | 91.8 | sq.m | 236.03 | ₹21,667.55 |
| 8 | Cement concrete with 30mm down graded shingles excluding shuttering
1:3:6 proportion | 6.89 | M.T | 5,529.6 | ₹38,098.94 |
| 9 | Civil Works
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
Depth of excavation not exceeding 1500 mm | 145.99 | Sq.M | 119.27 | ₹17,412.23 |
| 10 | Depth of excavation for additional depth beyond 1500mm and upto 3000mm but not requiring shoring. | 37.55 | cum | 192.38 | ₹7,223.87 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
Tendernotice_2.pdf
PDF • 1.61 MB
BOQ_2489336.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .