Loading…
Loading…
Tender Value
₹77.7 L
EMD Value
₹1.6 L
Closing Date
24 Aug 2026, 6:00 pmDue today
Executive Engineer PWD (RandB) Division Ramnagar.
Executive Engineer PWD (RandB) Division Ramnagar.
PLEASE REFER TO BOQ
2026_PWDJK_321473_1
e-NIT No. 45 of 2026-27 Dated- 19-08-2026
Open Tender
Civil Works
Percentage
90 days
RAMNAGAR
PLEASE REFER TO NIT
2 documents required · 2 mandatory
₹1,500
Executive Engineer PWD (RandB) Division Ramnagar.
₹1.6 L
19 Aug 2026
19 Aug 2026
25 Aug 2026
19 Aug 2026
24 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 3,506.25 | cum | 187.3 | ₹6,56,720.63 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
Ordinary Rock | 1,168.75 | cum | 392.8 | ₹4,59,085 |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
Hard Rock (Requiring Blasting ) | 1,168.75 | cum | 687.1 | ₹8,03,048.13 |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: all kinds of soil | 195.3 | cum | 479.3 | ₹93,607.29 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with.1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 25 | cum | 4,826.5 | ₹1,20,662.5 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 134 | cum | 5,733.6 | ₹7,68,302.4 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 744 | sqm | 286.35 | ₹2,13,044.4 |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. | 372 | sqm | 562.15 | ₹2,09,119.8 |
| 9 | Providing & Laying, spreading and compacting stone aggregate of size 63 mm to 45 mm in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to power grade and camber, applying and brooming 13.2mm nominal size (TYPE A ) of screening/ binding material, to fill up interstices of stone dust/course aggregate, watering and compacting to the required density. | 247.5 | cum | 2,218.49 | ₹5,49,076.27 |
| 10 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 247.5 | cum | 1,885.95 | ₹4,66,772.63 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_1073851.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].