Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹90,000Accepted-Finance | 1 | Accepted-Finance FOUND ELIGIBLE | |
| 2 | 2₹95,800+₹5,800 (6.44%)Accepted-Finance | 2 | Accepted-Finance FOUND ELIGIBLE | |
| 3 | 3₹97,950+₹7,950 (8.83%)Accepted-Finance BHAGWATI NAGAR JAMMU | 3 | Accepted-Finance FOUND ELIGIBLE | |
| 4 | 4₹1.0 L+₹11,300 (12.6%)Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | 4 | Accepted-Finance FOUND ELIGIBLE |
Tender Value
₹1.1 L
EMD Value
₹2,100
Closing Date
22 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/NowshERA
Strengthening /reconditioning of voltage stabilizer with allied works at LIS Kah.
2020_IFC_100363_1
24/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
8 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹2,100
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
24 Jul 2020
13 Jul 2020
23 Jul 2020
14 Jul 2020
22 Jul 2020
14 Jul 2020
16 Jul 2020
180 days
Strengthening to 250 Kva voltage stabilizer installed at Kah by means of disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables) .The job involves opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the damaged /burnt coils ( 3 nos.) by way of the dismantling of the core assembly and extraction of the burnt copper wire with the help of manual labour and suitable tools/tackles and shifting the same to the roadside using manual labour and transportation of the same to workshop by using mechanical transport . Rewinding of the three phase by using new copper wire of the superior quality. Then shifting the repaired coils back to site of LIS using mechanical transport and head load .. P/F of new panel accessories to panel of stabilizer by replacing the damaged with the new one.Replacement of rotor assembly (1 no.) in lieu of damaged one. The job involves P/F of 1 No’s volt meter (Output Meter), Meter phase indicator, phase indicator lamps. Boiling of the T.oil in stabilizer by draining it out of the tank. Heating the oil to make it completely moisture free, filling it back after complete cleaning and drying of tank. Providing filling of 100litre t.oil to make up for the deficit. Reinstallation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts..Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load . Complete job includes the cost of material, labour charges, transportation charges, other tools / tackles required at site.
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
BEE AAR ENTERPRISES
G S ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .