Tender Value
₹8.5 L
EMD Value
₹84,730
Closing Date
28 Sept 2026, 12:00 pm5d left
CHIEF ENGINEER CIVIL
NAGAR NIGAM AGRA
Zone-1, Chhatta Ward No. 66, Prakash Nagar Construction of an RCC drain from Hari Singh Nishad house to Gokul Chand house.
2026_DOLBU_1188549_1
11-09-2026/NAGAR NIGAM AGRA/26-09-2026/56
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NAGAR NIGAM
₹84,730
22 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. (17-Chapter SI.No.16) | 25 | Sqm | 93 | ₹2,325 |
| 2 | Removal of Silt for Nala/Nali in liquid mud or faul position with special T&P including lead 30m and lift up to 3.00m etc. all complete. (As per Attached sanctioned rate analysis) | 15.3 | Cum | 239 | ₹3,656.7 |
| 3 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) | 159.38 | Cum | 150 | ₹23,907 |
| 4 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) | 140.71 | Cum | 230.1 | ₹32,377.37 |
| 5 | Providing of Nala Bandha with sand bags. With local sand including etc. all complete. (Atached per Annalysis rate). | 15 | Nos | 600 | ₹9,000 |
| 6 | Providing of 8HP desel Pump set for dewatering including hire and fuel charge with operator etc. all complete. (None Scheduled) | 5 | Day | 850 | ₹4,250 |
| 7 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) | 11.9 | Cum | 5,325 | ₹63,367.5 |
| 8 | R.c.c work with cement approved coarse sand and 4cm gauge approved stone ballast in the proportion 1:2:4 (One part of Cement, 2 part of Coarse sand and 4 part of 4cm. stone grit) in R.CC Raft Foundation and Footing 4cm. Gauge approved stone ballast excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150 grade. (5-Chapter S.I.No.287) | 14.28 | Cum | 7,750 | ₹1,10,670 |
| 9 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1: 1½: 3 in (One part of Cement, 1½ part of Coarse sand and 3 part of 2cm. Stone Grit) Wall/R.CC Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGI binding wire and including necessary centring and shuttering etc. And also including supply of all materials labour and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-20 grade. {5-Chapter Si.No.11(i)} | 26.35 | Cum | 8,350 | ₹2,20,022.5 |
| 10 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.C.C Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150. (5-Chapter Si.No.8) | 2.4 | Cum | 7,750 | ₹18,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.78 MB
BOQ_2239074.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .