| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹33.8 LAccepted-Finance GRAM POST SATHIYAV MUBARAKPUR DISTRICT AZAMGARH | AZAMGARH | UTTAR PRADESH | 223221 | L-1 | Accepted-Finance Admitted | |
| 2 | L-2₹35.4 L+₹1.6 L (4.80%)Accepted-Finance | L-2 | Accepted-Finance Admitted | |
| 3 | L-3₹39.1 L+₹5.4 L (15.9%)Accepted-Finance BLOCK S HOUSE 75 MOHAN GARDEN WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | L-3 | Accepted-Finance Admitted |
Tender Value
₹43.7 L
EMD Value
₹44,000
Closing Date
15 Mar 2021, 4:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, Pathrahiya Road, Mirzapur
Annual maintenance of various 765/400/220 KV Transmission lines under ETD, Robertsganj for one year
2021_UPTCL_544390_1
36/2020-21/ETC/Mzp
Open Tender
Electrical Works
Fixed-rate
365 days
Robertsganj
As per tender specification
2 documents required · 2 mandatory
₹5,192
Executive Engineer, ETD, Mirzapur
₹44,000
15 Jul 2021
14 Jan 2021
16 Mar 2021
14 Jan 2021
15 Mar 2021
14 Jan 2021
Amount
Periodic tower to tower ground patrolling of following lines under ETD, Robertsganj (as per details enclosed with Part-I). The work includes capturing of co-ordinates of all tower locations, all power line crossing, river crossings, railway crossings, canal crossings, plantation under line corridor, preparing list of missing /loose/ hanging/ rusted/broken tower parts, stubs, broken chimney/coping, excavated/rain cut tower footings their surroundings, damaged revetment walls, missing/damaged tower accessories, conductor accessories and any other deformities observed at any location and submit report in triplicate copy. fixing of missing pieces & tightening of loose/hanging tower parts and nut & bolts and proper punching & tack welding (only missing tower parts nut-bolts & washer will be provided by department) and clearing the entire lines corridor from undesirable plantation, scrapers etc as per schedule mentioned below:- 1-Reguler patrolling will be done four times in a year. 2-Emergency patrolling will be done Immediately as and when required after tripping/breakdown of lines in affected portion only (approx qty twice the length of line in a year) 3-Cleaning of disc insulator will be done once in a year from October to November month (only in polluted area) 4-Thermal scanning will be done once in a year before the summer start. 5-Jumper tightening will be done once in a year after thermal scanning when required. 6-Missing tower parts replacement will be done immediately as per requirement. 7-Checking/tightening of conductor/earthwire /OPGW/ tower accessories will be done once in a year as well as when required. 8-Preventive maintenance/normal breakdown of damaged/broken jumpers/conductor/earthwire/ OPGW/insulator string etc. will be done at various locations immediately. Simultaneous normal breakdown of same line at different locations/different lines will be attended in parallel without any delay.
1. 765 KV Anpara C to D S/C line (2X2.6 Kms) 2. 400 KV Anpara B to D ckt-I&II (2X5 Kms) 3. 220 KV Obra-Allahabad ckt-I&II (loc No. 01 to 216) (2X76 Kms) 4. 220 KV Obra-Allahabad SC line (loc No. 323 to 507) (1X81 Kms) 5. 220 KV Obra-Sahupuri SC line (loc No. 01 to 271) (1X86 Kms) 6. 220 KV Obra-Robertsganj SC line (loc No. 01 to 99) (1X29.2 Kms) 7. 220 KV Churk-Sahupuri SC line (loc No. 01 to 203) (1X49 Kms) 8. 220 KV Robertsganj-JCIC Churk SC line (loc No. 01 to 37) (1X6.4 Kms)
Thermal Scanning during period for one years of above ckt length
shiv shankar enterprises
M/S KSHITIJ ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .