| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹3.4 L+₹37,850 (12.4%)Accepted-Finance NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
Refer Docs
EMD Value
₹3,700
Closing Date
8 May 2023, 2:00 pmClosed
SE Civil TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Repair and Maintenance of Existing Compound wall from 126 m to 259.70 m on West side of Camp 2 at Analmin Nagar
2023_EB_305008_1
Spec.No.SE CIVIL TTPS 92 2023 2024
Open Tender
Civil Works - Others
Item Rate
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,700
Yes
10 May 2023
21 Apr 2023
9 May 2023
21 Apr 2023
8 May 2023
21 Apr 2023
Amount
Providing two legged scaffolding for works up to 3m heights, using 10 to 13 cm dia. casurina props, the distance between two rows are being 1.25m and spacing of posts being 2m in both the rows with horizontal posts with 0.50m over lap on either side and braces at 2 m c/c including longitudinal and transverse middle braces to step up and providing a platform with country wood planks of 40 mm thick and 1 m width etc., including cost of all materials, labours, lead, lift, safety measures etc., complete.
Removal of damaged RCC jolly from the compound wall and stacking carefully as directed by the Engineer in charge with all labour, lead, lift etc., complete.
Hollow block masonry using hollow block of size (16'' x 8'' x8'') in CM 1:5 including cost of all materials, labours, lead, lift, curing, etc. complete.
Brick work in CM 1:5 using fly ash bricks (230 x 110 x 70mm) including cost of all materials, labour, lead, lift, curing, etc., complete.
Plastering with CM 1:5, 20mm thick including cost of all materials, labour, lead, lift, curing, etc., complete.
Collection and insertion of glass pieces over the top surface of compound wall for safety purpose including cost of glass pieces, labour, lead, lift, etc., complete.
TEAM ENGINEERING AND CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .