Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹49.6 LAccepted-Finance | ₹49.6 L | 1 | Accepted-Finance Being L1 |
| 2 | 2₹50.4 L+₹72,819.56 (1.47%)Accepted-Finance | ₹50.4 L+₹72,819.56 (1.47%) | 2 | Accepted-Finance Being L2 |
| 3 | 3₹52.3 L+₹2.7 L (5.44%)Accepted-Finance 2 GROUND FLOOR RANGAT JK AGENCY RANGAT VILLAGE TOWN HAWAMAHAL CITY RANGAT NORTH AND MIDDLE ANDAMAN ANDAMAN AND NICOBAR ISLANDS 744205 INDIA | NORTH AND MIDDLE ANDAMAN | ANDAMAN AND NICOBAR ISLANDS | 744205 | ₹52.3 L+₹2.7 L (5.44%) | 3 | Accepted-Finance Being L3 |
| 4 | 4₹53.9 L+₹4.3 L (8.68%)Accepted-Finance | ₹53.9 L+₹4.3 L (8.68%) | 4 | Accepted-Finance Being L4 |
| 5 | 5₹55.2 L+₹5.6 L (11.2%)Accepted-Finance | ₹55.2 L+₹5.6 L (11.2%) | 5 | Accepted-Finance Being L5 |
Tender Value
₹60.7 L
EMD Value
₹1.2 L
Closing Date
23 Apr 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, CD-I, APWD, Rangat
Construction of filter bed and CWR at proposed pond site, Kaushalyanagar under SD-II, CD-I, APWD, Rangat.
2026_APWD_22636_1
113/DB/CD-I/RGT/2025-26
Open Tender
Civil Works - Others
Percentage
180 days
Kaushalyanagar
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.2 L
5 May 2026
8 Apr 2026
23 Apr 2026
8 Apr 2026
23 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | |||||
| 1.1 | All kinds of soil | - | cum | - | - |
| 2Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | |||||
| 3Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | |||||
| 3.1 | All kinds of soil | - | sqm | - | - |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 4.1 | 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 5Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete: | |||||
| 5.1 | 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 6Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
TenderDocument.pdf
Tender Documents • 16.24 MB
BOQ_23984.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .