Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-AOC CHANDRA LOK COLONY WARD NO 1 NAVALPURA KHURJA BULANDSHAHR | HATHRAS | UTTAR PRADESH | 203001 | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹2.2 L+₹12,586 (6.08%)Rejected-Finance | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | NARENDRA KUMAR SHARMA L1 | MS R S BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance including lead upto 30m and lift upto 1.50M including ramming and dressing by manual labour. The earth/silt received from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in Charge. | 1,508 | Cum | 62 ₹93,496 Lowest | 63 ₹95,004 |
| 2.00 | Earth work in silt clearance including lift upto 1.50 M and lead upto 200 M (Disposal by Power Transportation) including ramming and dressing by manual labour. The earth/silt received from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in Charge. | 243 | Cum | 140 ₹34,020 Lowest | 150 ₹36,450 |
| 3.00 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. Complete in all respect as directed by Engineer in Charge. | 14,685 | Sqm. | 4 ₹58,740 Lowest | 4.5 ₹66,082.5 |
| 4.00 | V.R.B. or bridge clearance in Distributaries/Minors and writing words on perapet complete in all respect as directed by Engineer in Charge. | 8 | Nos. | 560 ₹4,480 Lowest | 660 ₹5,280 |
| 5.00 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 118 | Sqm. | 60 ₹7,080 Lowest | 70 ₹8,260 |
| 6.00 | Printing Latters upto 10 CM Hight including Material. Per Nos. | 117 | Each | 10 ₹1,170 Lowest | 11 ₹1,287 |
| 7.00 | Painting gauge incuding cost of Material up to 25 cm. width. | 0.9 | Rm. | 150 ₹135 Lowest | 160 ₹144 |
| 8.00 | Ist class brick work in Superstructur in 1:4 cement mortar using coarse sand including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. /M3 | 1 | Cum | 5,000 ₹5,000 | 4,200 ₹4,200 Lowest |
| 9.00 | Cement plaster with 1:4 Cement course sand mortar including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. | 29 | Sqm. | 100 ₹2,900 Lowest | 100 ₹2,900 Lowest |
Tender Value
₹2.2 L
EMD Value
₹5,000
Closing Date
21 Sept 2026, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
executive engineer
UMBDGC KHURJA
silt clearence work
2026_UPIDC_1185339_21
05/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹5,000
Yes
18 Oct 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearance including lead upto 30m and lift upto 1.50M including ramming and dressing by manual labour. The earth/silt received from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in Charge. | 1,508 | Cum | - | - |
| 2 | Earth work in silt clearance including lift upto 1.50 M and lead upto 200 M (Disposal by Power Transportation) including ramming and dressing by manual labour. The earth/silt received from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in Charge. | 243 | Cum | - | - |
| 3 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. Complete in all respect as directed by Engineer in Charge. | 14,685 | Sqm. | - | - |
| 4 | V.R.B. or bridge clearance in Distributaries/Minors and writing words on perapet complete in all respect as directed by Engineer in Charge. | 8 | Nos. | - | - |
| 5 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 118 | Sqm. | - | - |
| 6 | Printing Latters upto 10 CM Hight including Material. Per Nos. | 117 | Each | - | - |
| 7 | Painting gauge incuding cost of Material up to 25 cm. width. | 0.9 | Rm. | - | - |
| 8 | Ist class brick work in Superstructur in 1:4 cement mortar using coarse sand including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. /M3 | 1 | Cum | - | - |
| 9 | Cement plaster with 1:4 Cement course sand mortar including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. | 29 | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
corrigendumsilt.pdf
Additional Documents • 0.18 MB
BOQ_2230678.xls
BOQ • 0.25 MB
DATE.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .