| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance TANDA MAZRA TANDA MAZRA TANDA MAZRA MUZAFFARNAGAR MUZAFFARNAGAR UTTAR PRADESH 251308 | MUZAFFARNAGAR | UTTAR PRADESH | 251308 | L1 | Admitted-Finance | ||
| 2 | L2₹4.9 L+₹5,589.79 (1.15%)Admitted-Finance MOHALLA NAND PRASAD DISTRICT SHAMLI | SHAMLI | UTTAR PRADESH | L2 | Admitted-Finance | ||
| 3 | L3₹4.9 L+₹6,707.75 (1.38%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical As per Attached |
Tender Value
₹4.9 L
EMD Value
₹48,607
Closing Date
12 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EO NAGAR PANCHAYAT BUDHANA
NAGAR PANCHAYAT BUDHANA
WARD NO. 8 KANDHLA ROAD SE GAURAV PATWARI WALI GALI TAK NALI VA CC SADAK NIRMAN KARYA
2026_DOLBU_1106189_3
1576/N.P.BUDHANA/2025-26
Open Tender
Civil Works
Percentage
90 days
EO NAGAR PANCHAYAT BUDHANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,147
EO NAGAR PANCHAYAT BUDHANA
₹48,607
Yes
16 Feb 2026
14 Jan 2026
12 Feb 2026
14 Jan 2026
12 Feb 2026
14 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old brick laid on C.C.Interlocking tiles including stacking of old Tiles. As per S.I. No.10.3 New Item IV | 310.2 | m2 | 13 | ₹4,032.6 |
| 2 | Disposal of Malba from site. | 24.82 | m3 | 124.8 | ₹3,097.54 |
| 3 | Cement Concrete with 4 cm gauge approved stone Ballast,coarse sand & cement in the proportion of (8:4:1) including supply of all materials,labour,Tools & plants etc.required for proper completion of the work. Asper S.I. No. 279 | 4.2 | m3 | 4,850 | ₹20,370 |
| 4 | M-150 Brick Work in (1:4) with cement and coarse sand mortar in including supply of all materials labour,Tools & plants etc. required for proper completion of the work as per S.I.No.305 (a) | 3.17 | m3 | 4,690 | ₹14,867.3 |
| 5 | 12 mm thick plaster with cement and coarse sand in (1:4) over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. S.I. No. 584(a) | 36 | m2 | 165 | ₹5,940 |
| 6 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of (4:2:1) including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. S.I. No. 279(a) | 1.38 | m3 | 5,750 | ₹7,935 |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4 to 53 mm water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber,applying and brooming , stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-3 as per Technical specification Clause-405. | 24.82 | m3 | 3,275.7 | ₹81,302.87 |
| 8 | Cement concrete with 2 cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in cc pavement (thickness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture/Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. Asper S.I. No. 10.3 New Item 9 | 46.53 | m3 | 7,300 | ₹3,39,669 |
| 9 | M.S. or iron work in Stair case railing in heavy sizes such as trusses,built up gates,record racks,roof work,Gates etc.including rivetting or welding where necessary. Asper S.I. 502 A | 0.63 | Qtl | 6,150 | ₹3,854.21 |
| 10 | Supply and Fixing Inauguration stone with all completion. (L.S.) | 1 | Job | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.43 MB
BOQ_2041018.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .