Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | ₹1.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 LRejected-AOC | ₹1.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Z SAHULHAMMED L1 | S MARIAPPAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 27 | Cum | 130 ₹3,510 | 140 ₹3,780 |
| 2.00 | Plain Cement Concrete 1:5:10 (one cement five fine aggregates and ten coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 15 | Cum | 5,430 ₹81,450 | 5,500 ₹82,500 |
| 3.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 15 | Cum | 6,480 ₹97,200 | 6,500 ₹97,500 |
Tender Value
₹2.3 L
EMD Value
₹2,300
Closing Date
12 Dec 2025, 3:00 pmClosed
Municipal Commissioner
444, Tiruvengadam salai, Sankarankovil
Providing Cement Concrete Patch Work at Gomathiyapuram I Street And II Street
2025_MAWS_630081_2
2230/2025/E1
Open Tender
Miscellaneous Works
Sankarankovil Municipality
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹2,300
9 Apr 2026
9 Dec 2025
12 Dec 2025
9 Dec 2025
12 Dec 2025
9 Dec 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Plain Cement Concrete 1:5:10 (one cement five fine aggregates and ten coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
S MARIAPPAN (BID ID -1532488)
stage.html
html • 0.04 MB
techsummary_753883.pdf
finsummary_753883.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_753883.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid