| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-Finance 36 MAADI LINE SALEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 1 | Accepted-Finance Satisfied |
Tender Value
₹3.4 L
EMD Value
₹3,500
Closing Date
30 Jul 2020, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit III Boiler Statutory Inspection 2020 21 Flue Gas duct B side Patch up works and other repair works between APH outlet to ESP inlet
2020_EB_171637_1
SE / M-I / MTPS-I / BM / OT. 119 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
10 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹3,500
Yes
3 Aug 2020
16 Jul 2020
31 Jul 2020
16 Jul 2020
30 Jul 2020
16 Jul 2020
Amount
Charges for cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate and transporting of scrap to Central Stores/M.T.P.S.
Labour charges for welding eroded initial welding joints in the flue gas duct below 1.5 meters (including cost of electrode)
Labour charges for welding eroded initial welding joints in the flue gas duct above 1.5 meters (including cost of electrode)
Charges for transporting of 6mm M.S./ Checkered plates from Central Stores/MTPS to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions below 1.5 m of the flue gas duct and welding the same including the cost of welding electrodes .
Charges for transporting of 6mm M.S./Checkered plates from Central Stores/MTPS to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions above 1.5 meters side wall portions of the flue gas ducts and welding the same including the cost of welding electrodes.
Charges for transporting of 6mm M.S./Checkered plates from Central Stores/MTPS to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the flue gas ducts and welding the same including the cost of welding electrodes.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .