| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.2 L+₹24,791 (5.05%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | NELSON CONSTRUCTIONS L1 | N S CHELLAPANDIAN L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 | 20 | M3 | 102.91 ₹2,058.17 Lowest | 108.11 ₹2,162.16 |
| 2.01 | Supplying and filling in foundation and basement with M-Sand in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. | 2.5 | M3 | 418.72 ₹1,046.8 Lowest | 439.88 ₹1,099.69 |
| 3.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDU-CORP-BUILDING DATA-P-21-SL No:10 | 2.5 | M3 | 8,785.58 ₹21,963.94 Lowest | 9,229.47 ₹23,073.67 |
| 4.01 | Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete complying with standard specification For Super Structure in GF. MDU-CORP-BUILDING DATA-P-36-SL No:27 | 17.5 | M3 | 6,817.8 ₹1,19,311.49 Lowest | 7,162.27 ₹1,25,339.73 |
| 5.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. MDU-CORP-BUILDING DATA-P-26-SL No:14 | 36 | M2 | 1,092.26 ₹39,321.49 Lowest | 1,147.45 ₹41,308.22 |
| 6.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) MDU-CORP-BUILDING DATA-P-26-SL No:14 | 27 | M2 | 1,421.09 ₹38,369.41 Lowest | 1,492.89 ₹40,308.03 |
| 7.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in G.F. MDU-CORP-BUILDING DATA-P-27-SL No:15 | 8.5 | M3 | 9,453.67 ₹80,356.2 Lowest | 9,931.32 ₹84,416.22 |
| 8.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia MDU-CORP-BUILDING DATA-P-34-SL No:22 | 637.5 | Kg | 55.97 ₹35,682.15 Lowest | 58.8 ₹37,485 |
| 9.01 | Plastering with CM1:5(one cement and five sand) 12mm thick10m2. MDU-CORP-BUILDING DATA-P-41-SL No:43 | 150.5 | M2 | 295.27 ₹44,438.48 Lowest | 310.19 ₹46,683.75 |
| 10.01 | Painting two coats with approved cement paint | 150.5 | No | 161.6 ₹24,320.67 Lowest | 169.76 ₹25,549.48 |
Tender Value
₹4.9 L
EMD Value
₹4,909
Closing Date
7 Aug 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Construction of Compound wall at Thideer nagar and in ward no 76
2025_MAWS_582180_1
E2/EST- 33/ 25-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,909
7 Oct 2025
16 Jul 2025
7 Aug 2025
16 Jul 2025
7 Aug 2025
16 Jul 2025
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3
Supplying and filling in foundation and basement with M-Sand in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDU-CORP-BUILDING DATA-P-21-SL No:10
Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete complying with standard specification For Super Structure in GF. MDU-CORP-BUILDING DATA-P-36-SL No:27
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. MDU-CORP-BUILDING DATA-P-26-SL No:14
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) MDU-CORP-BUILDING DATA-P-26-SL No:14
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in G.F. MDU-CORP-BUILDING DATA-P-27-SL No:15
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia MDU-CORP-BUILDING DATA-P-34-SL No:22
Plastering with CM1:5(one cement and five sand) 12mm thick10m2. MDU-CORP-BUILDING DATA-P-41-SL No:43
Painting two coats with approved cement paint
Fabrication and Supply and fixing of steel door shutter made out of 40 x 40 x 6 mm MS angle section with necessary stiffeners 32 x 6 mm and flats at 30 cm intervals and necessary cross diagonals MS flats. The shutter frame shall be fully covered by 18G CC sheet and provided with required locking facilities and hinges including cost of red oxide primers. Fully panelled Single leaf - Door (0.75x2.10) 1.00 m x 2.50 m
Add GST 18%
N S CHELLAPANDIAN (BID ID -1419106)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .