Loading…
Loading…
Tender Value
₹7.0 L
EMD Value
₹14,000
Closing Date
10 Oct 2026, 5:00 pmDue tomorrow
Executive Engineer
Executive Engineer, Const Divn PWD B and R Br BTL
Construction od Community Haal at Village Dabanwal KAlan Block Fatehgarh Churian in District Gurdaspur
2026_CEPW_176379_1
33.02dt16092026
Open Tender
Civil Works - Buildings
Percentage
120 days
Block Fatehgarh Churian
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹14,000
Yes
29 Sept 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
10 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. (CSR 6.19) | 16.62 | Cum | 35.82 | ₹595.33 |
| - | Cement Concrete 1:6:12 with 40mm gauge stone aggregate | 3.17 | Cum | 3,860.98 | ₹12,239.31 |
| - | First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth.CSR 11.5 | 6.71 | Cum | 5,921.33 | ₹39,732.12 |
| - | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 3.99 | Cum | 5,814.45 | ₹23,199.66 |
| - | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 32.13 | Sqm | 221.24 | ₹7,108.44 |
| - | Centring and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. | 49.77 | Sqm | 560.46 | ₹27,894.09 |
| - | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 10.81 | Cum | 6,873.21 | ₹74,299.4 |
| - | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 550 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including binding, bending and placing in position complete | 12.79 | Qtl. | 7,962.73 | ₹1,01,843.32 |
| - | First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level. | 24.93 | Cum | 6,166.8 | ₹1,53,738.32 |
| - | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes (working ressure 4.00 kgf / cm²) conforming to IS : 4985, including jointing with seal ring (i) Single socketed pipes. (CSR 13.74a) U-PVC pipes (working pressure 4.00 kgf. / sqcm) Single socketed pipe 110 mm dia. | 9.15 | Mtr | 265.48 | ₹2,429.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
BOQ_359164.xls
BOQ • 0.31 MB
SBD_DabanwalKalan.pdf
Tender Documents • 1.76 MB
dnitdabanwalkalan.pdf
Additional Documents • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .