Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹306.50Accepted-AOC | 1 | Accepted-AOC ok | |
| 2 | 2₹377+₹70.50 (23.0%)Rejected-AOC | 2 | Rejected-AOC ok | |
| 3 | 3₹404.50+₹98 (32.0%)Rejected-AOC | 3 | Rejected-AOC ok | |
| 4 | 4₹405.50+₹99 (32.3%)Rejected-AOC | 4 | Rejected-AOC ok | |
| 5 | 5₹434.20+₹127.70 (41.7%)Rejected-AOC | 5 | Rejected-AOC ok |
| Sl No | Description | Qty | Unit | MATA DEE ENGINEERING SARNI L1 | SHREEYASH MANPOWER SERVICES PRIVATE LIMITED L3 | Shivani Construction L2 | MANNAT CONSTRUCTION L5 | SHIVSHAKTI CONSTRUCTION L6 | SHREE DAYA ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Inviting rates of construction material with complete work given below for Yearly.(2025-2026) Providing and applying all types of painting as mentioned following. | |||||||||
| 2.00 | Floor painting with Emulsion Paint (SQM) 1st Coat. | 1 | SQM | 21 ₹21 | 19 ₹19 Lowest | 20.5 ₹20.5 | 19.5 ₹19.5 | 1,40,000 ₹1,40,000 | 19 ₹19 Lowest |
| 3.00 | Floor painting with Emulsion Paint (SQM) 2nd Coat. | 1 | SQM | 16 ₹16 | 13 ₹13 | 10 ₹10 Lowest | 13.5 ₹13.5 | 80,000 ₹80,000 | 13 ₹13 |
| 4.00 | Floor painting with Emulsion Paint (SQM) 3rd Coat. | 1 | SQM | 11 ₹11 | 9 ₹9 | 8 ₹8 Lowest | 11.5 ₹11.5 | 70,000 ₹70,000 | 8 ₹8 Lowest |
| 5.00 | Emulsion Paint (SQM) 1st Coat. | 1 | SQM | 15 ₹15 Lowest | 20 ₹20 | 20.5 ₹20.5 | 18.3 ₹18.3 | 1,39,999 ₹1,39,999 | 19.5 ₹19.5 |
| 6.00 | Emulsion Paint (SQM) 2nd Coat. | 1 | SQM | 11 ₹11 | 14.5 ₹14.5 | 9 ₹9 Lowest | 13.3 ₹13.3 | 79,999 ₹79,999 | 13.5 ₹13.5 |
| 7.00 | Emulsion Paint (SQM) 3rd Coat. | 1 | SQM | 8 ₹8 | 10 ₹10 | 7 ₹7 Lowest | 11.1 ₹11.1 | 49,999 ₹49,999 | 8.5 ₹8.5 |
| 8.00 | Oil Bond Distemper (SQM) 1st Coat. | 1 | SQM | 10 ₹10 Lowest | 15 ₹15 | 16 ₹16 | 16.5 ₹16.5 | 99,999 ₹99,999 | 15 ₹15 |
| 9.00 | Oil Bond Distemper (SQM) 2nd Coat. | 1 | SQM | 8 ₹8 | 11 ₹11 | 7 ₹7 Lowest | 12.5 ₹12.5 | 79,999 ₹79,999 | 11 ₹11 |
| 10.00 | Oil Bond Distemper (SQM) 3rd Coat. | 1 | SQM | 6 ₹6 | 9 ₹9 | 5 ₹5 Lowest | 10.5 ₹10.5 | 49,999 ₹49,999 | 8 ₹8 |
Tender Value
₹25 L
EMD Value
₹18,750
Closing Date
17 May 2025, 5:30 pmClosed
CMO NAGAR PALIKA PARISHAD SARNI
CMO NAGAR PALIKA PARISHAD SARNI
Inviting rates of construction material with complete work given below for yearly (2025-26) Providing and applying all types of painting as mentioned paint.
2025_UAD_415359_1
PWD/E TENDER-4/2025/60 DATE07.04.2025 SARNI
Open Tender
Miscellaneous Works
Item Wise
365 days
ward no 03
as per nit condition
9 documents required · 9 mandatory
₹5,000
₹18,750
27 Oct 2025
17 Apr 2025
19 May 2025
17 Apr 2025
17 May 2025
18 Apr 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .