Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹48.1 LAccepted-Finance | ₹48.1 L | L-1 | Accepted-Finance 1 |
| 2 | L-2₹50.9 L+₹2.8 L (5.83%)Rejected-Finance | ₹50.9 L+₹2.8 L (5.83%) | L-2 | Rejected-Finance 2 |
| 3 | L-3₹52.4 L+₹4.3 L (9.00%)Rejected-Finance | ₹52.4 L+₹4.3 L (9.00%) | L-3 | Rejected-Finance 3 |
Tender Value
₹62.5 L
EMD Value
₹1.2 L
Closing Date
6 Apr 2026, 6:00 pmClosed
Executive Engineer
HPPWD Rohru
C O Health and Welness Cetre at Kuthari Tehsil Tikkar Distt Shimla SH Building Portion 1st floor only WS SI Site Development Septic Tank
2026_PWD_133035_1
28586-28685 Dated 30.3.2026
Open Tender
Civil Works - Buildings
Percentage
120 days
Rohru
Please refer Tender documents.
13 documents required · 13 mandatory
₹2,000
₹1.2 L
15 May 2026
1 Apr 2026
7 Apr 2026
1 Apr 2026
6 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavaion by mechainical means /manual means in foundation treanches of drains o.Including dresssing of sides ramming of bottoms | - | Per cubic mtr | - | - |
| 2 | Cutting in earth work in all heights and depth in all kinds of soils, including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer -in-Charge at site. according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and un- useful material and transportation of the un -useful material for disposing at dumping site (to be arranged by the contractor) to the satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its levelling fine dressing and with all kinds of labour ,machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All useful material such as stones shingles aggregates and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation and used / removed per the direction of engineer in charge. Any loss to the public and private property during the course of excavation and disposal of servicable and unservicable material shall be the absolute rtesponsibilty of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | - | Per Cum | - | - |
| 3 | Filling in plinth with sand under floors including watering ramming consolidating and dressing complete including carraige of material. | - | Per cubic mtr | - | - |
| 4 | Centering and shuttering including strutting ,propping etc. and removalof form for Foundations footings bases of columns etc. | - | Per cubic mtr | - | - |
| 5 | Centering and shuttering including strutting propping etc. and removal of form for Suspended floors , roofs ,landings , balconies and access platform. | - | Per cubic mtr. | - | - |
| 6 | Centering and shuttering including strutting propping etc. and removal of form for columns Pillars Piers,Abutments , Posts and Struts Circular complete including carraige of material. | - | per square mtr | - | - |
| 7 | Centering and shuttering including strutting propping etc. and removal of form for Lintels , beams ,plinth beams. | - | per square mtr | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to plinth level 1:5:10 | - | Per cubic mtr | - | - |
| 9 | Providing and laying in position cement concrete of specified grade 1:4:8 | - | Per cubic mtr. | - | - |
| 10 | Providingand laying in position cement c oncrete of specified grade excluding th ecost of centering and shuttering | - | Per cubic mtr. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_196788.xls
BOQ • 0.35 MB
SBD1.pdf
Tender Documents • 2.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .