Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.4 L+₹6,163.50 (4.69%)Rejected-AOC N A | FARIDABAD | HARYANA | 121004 | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.4 L+₹6,755 (5.14%)Rejected-AOC VILLAGE P O BARIN MANDIR TEHSIL TOUNI DEVI DISTT HAMIRPUR H P | L3 | Rejected-AOC L3 | |
| 4 | L4₹1.6 L+₹26,913.50 (20.5%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹1.6 L+₹28,601.95 (21.8%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹99,320
EMD Value
₹2,485
Closing Date
5 Jun 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer MC Solan
Executive Officer MC Solan
Construction of R.Wall near S.S Pawar house in ward no 11 Solan
2020_UDDHP_37553_1
TEN(5)20/2019-2240,13/05/2020
Open Tender
Civil Works
Item Rate
90 days
EO MC Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹200
EO MC Solan
₹2,485
Yes
22 Jun 2021
26 May 2020
6 Jun 2020
26 May 2020
5 Jun 2020
26 May 2020
90 days
Amount
Cutting in earth work and disposal of excavated earth upto a lead of 20m pick and jumper work. .as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material
Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in: Foundation and plinth:.as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:6) as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges
Providing weep holes in brick masonry/ stone masonry/plain reinforced concrete abutment ,wing wall, return wallwith100mm.dia PVC pipe extending through the full of the structures with slope of1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7
RAMESH CHAND
Anil Chauhan
GURU DEV SINGH
Rahul Sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .