Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.8 L+₹19,996.48 (7.69%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.0 L+₹40,728.12 (15.7%)Admitted-Finance VILL SEHSWAN VILL SEHSWAN KATHUA JAMMU KASHMIR 184144 | KATHUA | JAMMU AND KASHMIR | 184144 | L3 | Admitted-Finance | ||
| 4 | L4₹3.3 L+₹70,183.72 (27.0%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.1 L+₹1.5 L (59.2%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
30 Jul 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of new Kitchen shed at G.P.C Changi ward no.4 Panchayat Changi Block Marheen
2026_RDPR_316708_7
e-NIT No.125/REW/K of 2026-27 Dated 18/07/2026
Open Tender
Civil Works
Percentage
90 days
MARHEEN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹9,800
11 Aug 2026
18 Jul 2026
31 Jul 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, A.K.O.S | 13.52 | Cum | 479.3 | ₹6,480.14 |
| 2 | Providing and laying in position cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:5:10(1 cement:5 coarse sand:10 garded stone 40 mm nominal size ] | 4.5 | cum | 4,826.2 | ₹21,717.9 |
| 3 | Providing and laying in position cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:3:6(1 cement:3 coarse sand:6 garded stone 20 mm nominal size ] | 10.13 | Cum | 5,733.6 | ₹58,081.37 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in 1:6 cement mortar | 0.76 | Cum | 7,571.55 | ₹5,754.38 |
| 5 | P/Laying Cement concrete flooring 40mm thick in 1:2:4 mix | 39.03 | sqm | 283.8 | ₹11,076.71 |
| 6 | P/Laying 12mm thick cement plaster in 1:6 c.mortar | 69.89 | sqm | 266.2 | ₹18,604.72 |
| 7 | Providing and laying in position reinforcement cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:1.5:3(1 cement:1.5coarse sand:3 garded stone 20 mm nominal size ] | 11.37 | Cum | 7,788 | ₹88,549.56 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 1,398 | kg | 123.2 | ₹1,72,233.6 |
| 9 | Finishing walls with water proofing cement paint required shade on New work (two or more coats applied @ 3.84 kg/10sqm) | 52.86 | sqm | 98.75 | ₹5,219.93 |
| 10 | Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc including switchs led lamp as required. | 8 | No. | 1,050 | ₹8,400 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
BOQ_1034678.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .