| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Finance | ₹8.7 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 L+₹16,325.80 (1.88%)Admitted-Finance | ₹8.8 L+₹16,325.80 (1.88%) | L2 | Admitted-Finance |
| 3 | L3₹11.1 L+₹2.4 L (27.8%)Admitted-Finance | ₹11.1 L+₹2.4 L (27.8%) | L3 | Admitted-Finance |
| 4 | L4₹11.8 L+₹3.2 L (36.6%)Admitted-Finance | ₹11.8 L+₹3.2 L (36.6%) | L4 | Admitted-Finance |
| 5 | L5₹11.8 L+₹3.2 L (36.7%)Admitted-Finance | ₹11.8 L+₹3.2 L (36.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHAN CONSTRUCTIONS L1 | ABID ALI PHAPHOO L2 | M/S DAR CONSTRUCTIONS PROP. BASHIR AHMAD DAR L4 | TAHIR MOHI UD DIN MIR L5 | FAYAZ AHMAD DAR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Part A: Yard Concreting & Metalling of Receiving Station Bagimehtab. | ||||||||
| 2.00 | Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water,uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts | 283.3 | sqm | 20 ₹5,666 | 3 ₹849.9 Lowest | 61 ₹17,281.3 | 62 ₹17,564.6 | 50 ₹14,165 |
| 3.00 | Prvoding and laying hand packed stone soling in foundation, under floors etc. incluidng ramming, watering, consolidating and all carriages / head load upto site of work complete. | 283.3 | sqm | 70 ₹19,831 | 10 ₹2,833 Lowest | 106 ₹30,029.8 | 107 ₹30,313.1 | 100 ₹28,330 |
| 4.00 | P/L cement conc. 1:2:4 with 40mm nominal stone agg. | 28.8 | cum | 5,000 ₹1,44,000 Lowest | 5,800 ₹1,67,040 | 6,700 ₹1,92,960 | 6,700 ₹1,92,960 | 6,300 ₹1,81,440 |
| 5.00Part B: Yard Concreting & Metalling of Receiving Station Exhibition. | ||||||||
| 6.00 | Uprooting rank vegetation and weeds by digging the area to a depth of
60 cm removing all weeds and other growth with roots by forking
repeatedly, breaking clods, rough dressing, flooding with water,
uprooting fresh growths after 10 to 15 days and then fine dressing for
planting new grass, including disposal of all rubbish with all leads and lifts | 315.7 | sqm | 20 ₹6,314 | 3 ₹947.1 Lowest | 61 ₹19,257.7 | 62 ₹19,573.4 | 50 ₹15,785 |
| 7.00 | Prvoding and laying hand packed stone soling in foundation, under floors etc. incluidng ramming, watering, consolidating and all carriages / head load upto site of work complete. | 315.7 | sqm | 107 ₹33,779.9 | 10 ₹3,157 Lowest | 106 ₹33,464.2 | 107 ₹33,779.9 | 100 ₹31,570 |
| 8.00 | Prvoding and laying cement conc. 1:2:4 with 40mm nominal stone agg. | 32.1 | cum | 5,000 ₹1,60,500 Lowest | 6,000 ₹1,92,600 | 6,500 ₹2,08,650 | 6,500 ₹2,08,650 | 6,300 ₹2,02,230 |
| 9.00Part C: Yard Concreting & Metalling of Receiving Station Rangreth. | ||||||||
| 10.00 | Uprooting rank vegetation and weeds by digging the area to a depth of
60 cm removing all weeds and other growth with roots by forking
repeatedly, breaking clods, rough dressing, flooding with water,
uprooting fresh growths after 10 to 15 days and then fine dressing for
planting new grass, including disposal of all rubbish with all leads and lifts | 468 | sqm | 20 ₹9,360 | 3 ₹1,404 Lowest | 62 ₹29,016 | 62 ₹29,016 | 50 ₹23,400 |
Tender Value
₹8.9 L
EMD Value
₹17,780
Closing Date
6 Aug 2025, 4:30 pmClosed
Executive Engineer, STD-II, Rajbagh,Srinagar
Office of the Executive Engineer, STD-II, Rajbagh
33 kV Yard Concreting/ Metalling of Receiving Stations Bagimehtab, Exhibition, Rangreth and Rawalpora.
2025_PDD_281389_1
eNIT No STD-II / 21 of 2025-26 Dated 14-07-2025
Open Tender
Civil Works
Turn-key
Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer, STD-II, Rajbagh,Srinagar
₹17,780
11 Aug 2025
16 Jul 2025
7 Aug 2025
16 Jul 2025
6 Aug 2025
16 Jul 2025
Amount
Part A: Yard Concreting & Metalling of Receiving Station Bagimehtab.
Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water,uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts
Prvoding and laying hand packed stone soling in foundation, under floors etc. incluidng ramming, watering, consolidating and all carriages / head load upto site of work complete.
P/L cement conc. 1:2:4 with 40mm nominal stone agg.
Part B: Yard Concreting & Metalling of Receiving Station Exhibition.
Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts
Prvoding and laying hand packed stone soling in foundation, under floors etc. incluidng ramming, watering, consolidating and all carriages / head load upto site of work complete.
Prvoding and laying cement conc. 1:2:4 with 40mm nominal stone agg.
Part C: Yard Concreting & Metalling of Receiving Station Rangreth.
Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts
Prvoding and laying hand packed stone soling in foundation, under floors etc. incluidng ramming, watering, consolidating and all carriages / head load upto site of work complete.
Prvoding and laying cement conc. 1:2:4 with 40mm nominal stone agg.
Part D: Yard Concreting & Metalling of Receiving Station Rawalpora.
Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts
Prvoding and laying hand packed stone soling in foundation, under floors etc. incluidng ramming, watering, consolidating and all carriages / head load upto site of work complete.
Prvoding and laying cement conc. 1:2:4 with 40mm nominal stone agg.
Note: The material utilized/works executed shall be stritctly as per REC Standards with Latest amendments there off.
ABID ALI PHAPHOO (BID ID -2434805)
FAYAZ AHMAD DAR (BID ID -2432135)
M/S DAR CONSTRUCTIONS PROP. BASHIR AHMAD DAR (BID ID -2431430)
TAHIR MOHI UD DIN MIR (BID ID -2431260)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .