Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC NEAR RADHA KRISHNA MANDIR VIKASH BHAWAN JAYANT SINGRAULI MP PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | L1 | Accepted-AOC RECOMMENDED BY TC | |
| 2 | L2₹7.5 L+₹37,554.68 (5.30%)Rejected-Finance KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | L2 | Rejected-Finance NOT L1 | |
| 3 | L3₹9.2 L+₹2.1 L (29.9%)Rejected-Finance SARSAVAH RAJA POST JAYANT DISTT SINGRAULI MP 486890 | JAYANT | SINGRAULI | MP | 486890 | L3 | Rejected-Finance NOT L1 |
Tender Value
Refer Docs
EMD Value
₹8,100
Closing Date
16 Aug 2022, 11:00 amClosed
GM (Excavation) , Dudhichua Project
Office of the GM (Excavation) , Dudhichua Project PO Khadia, Distt Sonebhadra, UP- 231 222
Offloading the work for Repairing of Swing Shaft Bearing Housing and Damaged foundation holes of both swing gear box of 2 nos PH1900AL shovels PH15 and PH19 of Dudhichua Project
2022_NCL_252454_1
DCH/GM (Excv)/Tender /Shovel/2022-23/27
Open Tender
Excavation Department Work
Item Rate
365 days
NCL, DUDHICHUA PROJECT
Please refer Tender documents
4 documents required · 4 mandatory
₹8,100
3 Sept 2022
5 Aug 2022
17 Aug 2022
5 Aug 2022
16 Aug 2022
6 Aug 2022
5 Aug 2022 - 13 Aug 2022
Amount
SCOPE OF WORK :- 1. Cleaning of working area before & after dismantling and after repairing of holes and housings. 2. Dismantling of gear-box and swing shaft. 3. Under-cutting, re-building and boring of bearing housing as per dimension (co-axial boring @3392 cm3 per shovel) {Final ID = 300 mm; Length = 180 mm}. 4. Repairing of damaged / worn-out foundation holes of swing transmission involving re-building by welding and re-threading by manual tap set for size 38 mm approx. (@ 24 nos. holes per shovel). 5. Repairing of swing shaft assembly holes of size ¾” x 3” (@ 16 nos. per shovel). Note :- • All involved tools and tackles, grinders with wheels, gas cutting set with accessories, hand lamps with bulbs, hydraulic jacks (20 T), welding machines with accessories and all safety devices, to and fro transportation of manpower and machinery, etc. shall be responsibility of the contractor. • Electric power supply, welding electrodes, crane support as required, required bolts and industrial gases will be provided departmentally by NCL. • Work has to be done within 11 days per shovel. • Work has to be done in G-shift per day only.
Total labour cost including contractor profit (Exclusive of GST) for complete work as per SCOPE OF WORK and NIT
Total boring charge (Exclusive of GST) towards Under-cutting & boring of bearing housing (@ 3392.00 cu.cm. per shovel) as per SCOPE OF WORK and NIT
Total charge (Exclusive of GST) towards Repairing of damaged / worn-out foundation holes of swing transmission (@ 24 nos. holes per shovel) as per SCOPE OF WORK and NIT
Total charge (Exclusive of GST) towards Repairing of swing shaft assembly holes (@ 16 nos. per shovel) as per SCOPE OF WORK and NIT
Total charge (Exclusive of GST) towards drill bits, drill guides, reamers, tap set & other attachments (@24 nos. per shovel) as per SCOPE OF WORK and NIT
Total hiring charge (Exclusive of GST) for hiring of welding machines with accessories for complete work duration as per SCOPE OF WORK and NIT
Total hiring charge (Exclusive of GST) for hiring of gas cutting sets with accessories for complete work duration as per SCOPE OF WORK and NIT
Total hiring charge (Exclusive of GST) for hiring of grinder with accessories for complete work duration as per SCOPE OF WORK and NIT
Total hiring charge (Exclusive of GST) for hiring of Hydraulic Jack (20 T) for complete work duration as per SCOPE OF WORK and NIT
Total hiring charge (Exclusive of GST) for hiring of hand lamps with bulbs for complete work duration as per SCOPE OF WORK and NIT
Total transportation charge (Exclusive of GST) for transportation of tools and manpower to work-site for complete work duration as per SCOPE OF WORK and NIT
Total hiring charge (Exclusive of GST) for all required tools & tackles, jigs & fixtures for complete work duration as per SCOPE OF WORK and NIT
Total impact of GST for the purpose of CTC
SHASHI ENGINEERING WORKS
SUNSHINE ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_260935.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .