Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.8 LAdmitted-Fee/PreQual/Technical/Finance MAHUADAND LATEHAR | LATEHAR | JHARKHAND | 822111 | -27.89% | ₹19.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.5 L+₹71,853.94 (3.63%)Admitted-Fee/PreQual/Technical/Finance AVAGVOLI MAHUADANR LATEHAR | LATEHAR | LATEHAR | JHARKHAND | -25.27% | ₹20.5 L+₹71,853.94 (3.63%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹27.5 L
EMD Value
₹55,000
Closing Date
10 Sept 2026, 5:00 pmClosed
ZILA ABHIYNTA LATEHAR
ZILA ABHIYNATA OFFICE LATEHAR
Construction of PCC Road From REO Road to Jeerafool Rice Mil at Rampur, GP Mahuadanr, Block Mahudanr, District- Latehar
2026_ZPLAT_118207_1
ZP/LATEHAR/25/2026-27/ Group_50
Open Tender
Civil Works - Roads
Percentage
120 days
MAHUADANR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹55,000
12 Sept 2026
4 Sept 2026
12 Sept 2026
4 Sept 2026
10 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and Removal of Rubish Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area SOR NO. 2.02 RDD | 0.23 | hac | 19,760.3 | ₹4,544.87 |
| 2 | Construction of Subgrade and Earthen Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. SOR. ITEM NO. 3.18 RDD | 223.2 | CUM | 131.3 | ₹29,306.16 |
| 3 | Granular Sub-Base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. SOR. ITEM NO. 4.01 B(iii)RDD | 109.08 | CUM | 1,437.6 | ₹1,56,813.41 |
| 4 | Cement Concrete pavement providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:1.5:3 (1 Cement 1.5 coarse sand (zone iii) 3 Graded stone aggregate 20mm nominal size. 5.3.1.1 | 352.24 | CUM | 4,961.63 | ₹17,47,684.55 |
| 5 | Carriage of materials
Cement | 210.22 | CUM | 549.1 | ₹1,15,431.8 |
| 6 | Sand | 158.51 | CUM | 372.28 | ₹59,010.1 |
| 7 | Stone Chips | 456.53 | CUM | 412.6 | ₹1,88,364.28 |
| 8 | Add 18% GST Amount | 1 | Nos | - | - |
| 9 | Add 1% Labour Cess Amount | 1 | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Group_50.pdf
Tender Documents • 1.02 MB
BOQ_159862.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .