Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LQualified 4 48 SETH ENGINEERING WORKS SAHIBABAD INDUSTRIAL AREA SITE IV GHAZIABAD UTTAR PRADESH 201010 | GHAZIABAD | UTTAR PRADESH | 201010 | L1 | Qualified | |
| 2 | L2₹1.4 L+₹18,642 (14.9%)Qualified 243 LIG ROAD SINGRAULI SINGRAULI SINGRAULI MP MADHYA PRADESH 486889 | SINGRAULI | MADHYA PRADESH | 486889 | L2 | Qualified | |
| 3 | L3₹1.6 L+₹33,990 (27.2%)Qualified 36 HARI SHANKAR SHAH JAYNAGAR POST SHAHPUR WAIDHAN SINGRAULI M P 486886 486886 SINGRAULI MADHYA PRADESH 486886 | SINGRAULI | MADHYA PRADESH | 486886 | L3 | Qualified | |
| 4 | L4₹2.2 L+₹90,984 (72.9%)Qualified 1 NEW SHIVALIK NAGAR BHEL THDC COLONY BHEL HARIDWAR UTTARAKHAND 249403 | HARIDWAR | UTTARAKHAND | 249403 | L4 | Qualified | |
| 5 | L5₹2.2 L+₹96,042 (77.0%)Qualified 238B AJC BOSE ROAD KOLKATA KOLKATA WEST BENGAL 700020 | KOLKATA | WEST BENGAL | 700020 | L5 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
7 Jul 2025, 5:00 pmClosed
Submersible Pump Starters (Motor starter controls) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6349798 Dated : 16-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
7972865
GEM/2025/B/6349798
Two Packet Bid
Submersible Pump Starters (Motor starter controls) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria
30 days
Kumar140124Bhakra Beas Management Board, Irrigation Wing, NANGAL TOWNSHIP
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
16 Jun 2025
16 Jun 2025
7 Jul 2025
Submersible Pump Starters (Motor starter controls) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6349798 Dated : 16-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7972865.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .