| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹1.2 L+₹4,300 (3.59%)Rejected-AOC | L2 | Rejected-AOC Found 2nd Higher | |
| 3 | L3₹1.4 L+₹17,680 (14.7%)Rejected-AOC | L3 | Rejected-AOC Found 3rd Highest |
Tender Value
Refer Docs
EMD Value
₹1,500
Closing Date
17 Nov 2020, 2:00 pmClosed
SUPERINTENDING ENGINEER, EDC, BANDA
Chilla Road, Indira Nagar, Banda
Increasing Capacity work of 11 KV Sub-Stations and erection of plinth under EUDD, Banda
2020_DVVNL_518598_2
54/SE/EDCB/2020-21
Open Tender
Electrical Works
Item Rate
30 days
BANDA
As per annexured
2 documents required · 2 mandatory
₹1,180
DVVNL
₹1,500
O/O SE, EDC, BANDA
24 Mar 2021
6 Nov 2020
17 Nov 2020
6 Nov 2020
17 Nov 2020
6 Nov 2020
13 Nov 2020
Amount
The work of INCREASING CAPACITY OF 11 KV SUB-STATIONS & ERECTION OF PLINTH in various place as NEAR LULUA TALAB, MAHOKHAR & NEAR ARYAVART BANK, MAHOKHAR (BANDA TOWN) fed from 33/11 KV Sub-Station, TULSI NAGAR under BUSINESS PLAN Year 2020-21 at EDSD, CHILLA ROAD, BANDA as per passed package no. 04 & 05/BND/BP/2020-21 under EUDD, BANDA, including safe carriage of all required material from E.S.C., BANDA to work site and also cartage of old/damaged scraped line material from work site to E.S.C., BANDA, alongwith its loading, unloading & dragging at the respective ends, details of the work as given below :-
Safe cartage of line material
Safe cartage of 250 KVA Transformer
Carriage with laying, stringing, binding and termination of PVC Cable as per RESSPO manual & direction of engineer incharge.
Construction of new 250 KVA Transformer plinth of size 3460x4460x550 mm above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly. After that a retaining wall of 9” width by first class brick in ratio 1:5 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. Jail of 12 mm MS tore shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer.
Installation of 250 KVA Transformers on the newly erected D/P structure/Plinth in proper alignment as per direction of Engineer incharge/RESSPO manual.
Safely removing/dismantling of 100 KVA Capacity T/F from the double after opening of connection & fitting and safely carriage of the same from work site to JE's (Store)/Store Centre as per direction of Engineer incharge/RESSPO manual.
M/s. ACTIVE AUTOMOBILE, BEHIND ZILA PARISHAD, BANDA
M/s. SONU ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .