Loading…
Loading…
Tender Value
₹4.9 Cr
EMD Value
₹9.8 L
Closing Date
5 Sept 2026, 6:00 pm
DGM C and P division
Omkareshwar Power Station, Administrative Block, URJA VIHAR, Siddhwarkut Distt. Khandwa
Construction of new Field Hostel at Urja Vihar Parisar, Omkareshwar Power Station
2026_NHDC_922739_1
NHDC/3C/374/NIT-802/26/607 dated 19.08.2026
Open Tender
Civil Works - Buildings
Percentage
365 days
Omkareshwar Power Station NHDC Ltd Siddhwarkut
Please refer Tender documents.
14 documents required · 14 mandatory
₹1,770
NHDC LIMITED
₹9.8 L
Yes
21 Aug 2026
21 Aug 2026
8 Sept 2026
21 Aug 2026
5 Sept 2026
21 Aug 2026
21 Aug 2026 - 31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m lead and lift up to 1.5 m, disposed soil to be levelled and neatly dressed, All kinds of soil | 1 | Sqm | 51.25 | ₹51.2 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil | 1 | cum | 175.19 | ₹175.01 |
| 3 | Excavating trenches of required width for pipes, cables, etc. including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : (No extra lift is payable if work is done by mechanical means) in all kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia. | - | metre | 185.92 | - |
| 4 | Excavating trenches of required width for pipes, cables, etc. including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : (No extra lift is payable if work is done by mechanical means) in all kinds of soil Pipes, cables etc., not exceeding 80 mm dia. | - | metre | 114.41 | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : M-10Nominal (Mix-1 Cement : 3 sand : 6 graded stone aggregate) | 1 | cum | 4,636.1 | ₹4,631.46 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for :Upto plinth: Foundations, footings, bases for columns, plinth beams, curtain walls, columns below plinth. | 1 | sqm | 201.41 | ₹201.21 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete (nominal / design mix with 20mm nominal size graded stone aggregate) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : M-20 Grade Concrete | - | cum | 7,333.15 | - |
| 8 | Preconstruction antitermite treatment to the building under construction by providing.
Stage 1: Treating the bottom and the sides (upto 30 cm height of the excavated trench @ 5 liters per sqm of the surface area.
Stage 2: After masonry/RCC work, the backfill in the immediate contact with the foundation structure treatment @ 7.5 liters per sqm. Of the vertical surface of the substructure for each side.
Stage 3: surface treatment by spreading emulsion over the plinth area before laying the base concrete under floors @ 5.0 litres/Sqm.
Stage 4: Pumping the emulsion in plinth masonry on filling side at floor junction @ 7.5 litres/Sqm.
Stage 5: Pumping the emulsion from outer side of the plinth below ground around the masonry @ 5.0 litres/Sqm as per I.S. 8944 Emulsion. (1Chlorpyrifos: 19 water) with five years service guarantee (Measurements to be taken for
plinth area)
Note – Treatment should start when foundation trenches and pits are ready to take bed concrete or leveling course in foundations. Lying of bed concrete should start when the chemical emulsion has been absorbed by the soil and the surface is reasonably dry. Treatment should not be carried out when it is raining or when soil is wet with rain or subsoil water. This also applies to fill up soil within the plinth area before laying the subgrade for flooring. | - | sqm | 162.08 | - |
| 9 | Making plinth protection 50mm thick of cement concrete grade M10 over 75mm bed of dry metal ballast 40mm nominal size well rammed and consolidated and filled with sand including finishing the top smooth (with 20mm nominal size graded stone aggregate.) | 1 | sqm | 418.32 | ₹417.9 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for : Columns, P i l l a r s , Piers, Abutments, Posts and Struts. | - | sqm | 561.57 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
BOQ_969868.xls
BOQ • 0.35 MB
374ten.pdf
Tender Documents • 32.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].