Tender ID
Tender Value
₹57.4 L
EMD Value
₹1.1 L
Closing Date
30 Apr 2026, 5:00 pmClosed
CWE (AF) BAGDOGRA
Commander Works Engineers (AF) Bagdogra Bagdogra Airport (WB) Pin- 734 421 Tele 0353 - 2698308
COMPLETION OF INCOMPLETE WORK PROVN OF COMPLEX FOR PROJECT E-MMS PROJECT WCDMA AND PROJECT IRON AT KURSEONG UNDER GE (AF) BAGDOGRA
2026_MES_750931_2
8686/BAG/2025-26/E8
Open Tender
Civil Works
Lump-sum
180 days
BAGDOGRA
MES Contractor enlisted as Class C category a(i) having deposited Standing Security of Rs 1,75,000.00 with dept. Contractors not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
10 documents required · 10 mandatory
₹1,000
GE (AF) BAGDOGRA
₹1.1 L
Yes
26 Mar 2026
26 Mar 2026
4 May 2026
26 Mar 2026
30 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Lump sum price to be worked out by the Contractor for balance work of Building after termination of original contract excluding already executed work "Building works” as listed in Schedule ‘A’ Part- I
Note:- Bidders are to note that 50.16% work has already been executed as specified in Yard Stick att in tender documents. The Total Cost of building was Rs. 28.00 Lakhs. The Balance Amount 49.84% of 28.00 Lakhs is reflected here in Col 5 | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “Site Clearance, excavation and earth work” as listed in Schedule ‘A’ Part- II | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “Internal Electrification” as listed in Schedule ‘A’ Part- III | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for "Internal Water Supply” as listed in Schedule ‘A’ Part- IV | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “Fire Alarm / Smoke Detection” as listed in Schedule ‘A’ Part- V | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “Path” as listed in Schedule ‘A’ Part- VI | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “External Water Supply” as listed in Schedule ‘A’ Part- VII | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for "External Electric Supply” as listed in Schedule ‘A’ Part- VIII | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “Sewage Disposal” as listed in Schedule ‘A’ Part- IX | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “Area Drainage” as listed in Schedule ‘A’ Part- X | - | Lump sum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
8686tenderdocuments1.pdf
Tender Documents • 1.52 MB
BOQ_848935.xls
BOQ • 0.49 MB
DrawingsEMMS.rar
Additional Documents • 2.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .