Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
26 Mar 2026, 3:00 pmClosed
DGM CNP
APL NAMRUP DIBRUGARH ASSAM PIN 786623
INSTALLATION OF AT TANKER WASHING CENTER WITH ETP AT APL Namrup
2026_ICD_51561_1
APL/CnP/Civil/2025-26/573
Open Tender
Composite Works
Item Rate
180 days
ASSAM PETRO-CHEMICALS LIMITED, NAMRUP
AS SPECIFIED IN TENDER
3 documents required · 3 mandatory
₹1,700
₹1.7 L
Yes
APL,NAMRUP
26 Mar 2026
27 Feb 2026
27 Mar 2026
27 Feb 2026
26 Mar 2026
27 Feb 2026
9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | cum | 1.25 | - |
| 1.02 | Providing soling in foundation and under floor with stone / best quality picked jhama brick, and sand packed and laid to level and in panel after preparing the subgrade as directed. | 261 | sqm | - | - |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 34.25 | cum | 100 | ₹3,425 |
| 1.04 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 0.8 | cum | 53 | ₹42.35 |
| 1.05 | Ploughing the existing ground to a depth of 15 cm to 25 cm and watering
the same. | 20 | cum | 10 | ₹200 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : PCC 1:3:6 | 1 | cum | 11 | ₹10.99 |
| 1.07 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : RCC Proportion 1:1.5:3 | 0.6 | cum | - | - |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal
of form for | 1 | sqm | 100 | ₹99.9 |
| 1.09 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 0.6 | Kg | 53 | ₹31.8 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.34 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_81845.xls
BOQ • 0.33 MB
NIT_573.pdf
Tender Documents • 1.29 MB
Corr-1.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .