| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹11.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.0 L+₹11.53 (<0.01%)Admitted-Fee/PreQual/Technical/Finance | ₹11.0 L+₹11.53 (<0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹13.3 L+₹2.3 L (21.3%)Admitted-Fee/PreQual/Technical/Finance AT GORUAL PO GORUAL PS BRAHMAGIRI DIST PURI PIN 752002 | PURI | PURI | ODISHA | 752002 | ₹13.3 L+₹2.3 L (21.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹14.3 L+₹3.4 L (30.5%)Admitted-Fee/PreQual/Technical/Finance | ₹14.3 L+₹3.4 L (30.5%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹14.4 L+₹3.4 L (30.8%)Admitted-Fee/PreQual/Technical/Finance | ₹14.4 L+₹3.4 L (30.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | AMBIKA PRASAD BEHERA L5 | SARITA MOHAPATRA L2 | RAMAKANTA BISWAL L3 | Tapan Mahapatra L4 | JHARANA DAS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Site clearance & approach road for construction work | 550 | sqm | 1 ₹550 Lowest | 1.74 ₹957 | 2.12 ₹1,166 | 1 ₹550 Lowest | 1.74 ₹957 |
| 2.00 | Drilling a perfectly vertical bore hole of 150mm/100mm dia in hard rock formation as required to the site condition as per direction including cost of acssesories,tools & plants,consumables & rig charges etc. complete | 330 | Mtr | 647 ₹2,13,510 | 493.88 ₹1,62,980.4 | 599.03 ₹1,97,679.9 | 647 ₹2,13,510 | 493.87 ₹1,62,977.1 Lowest |
| 3.00 | Lowering Of 125mm dia blank PVC pipe 80 Sch. Without 3 mtr slot in perfectly vertical position including cost of pipes etc complete | 275 | Mtr | 876 ₹2,40,900 | 668.47 ₹1,83,829.25 Lowest | 810.8 ₹2,22,970 | 876 ₹2,40,900 | 668.47 ₹1,83,829.25 Lowest |
| 4.00 | Lowering Of 125mm dia blank PVC pipe 80 Sch. With 3 mtr slot in perfectly vertical position including cost of pipes etc complete | 33 | Mtr | 880 ₹29,040 | 671.11 ₹22,146.63 Lowest | 814 ₹26,862 | 880 ₹29,040 | 671.11 ₹22,146.63 Lowest |
| 5.00 | Operation of Compressor for development of B/W LS | 11 | No | 2,809 ₹30,899 | 2,142.06 ₹23,562.66 Lowest | 2,598 ₹28,578 | 2,809 ₹30,899 | 2,142.06 ₹23,562.66 Lowest |
| 6.00 | Well Cap 5" Dia With PVC Cone | 11 | No | 400 ₹4,400 | 305.05 ₹3,355.55 Lowest | 370 ₹4,070 | 400 ₹4,400 | 305.05 ₹3,355.55 Lowest |
| 7.00 | Supplying & Lying of R C C Ring 5ft made up of 6 mm dia MS rod for storage cum recharge pit including cost, transporting etc complete. | 132 | Nos | 1,120 ₹1,47,840 | 854.14 ₹1,12,746.48 Lowest | 1,036 ₹1,36,752 | 1,100 ₹1,45,200 | 854.14 ₹1,12,746.48 Lowest |
| 8.00 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction 1st extra lift of 1.5 mtr. | 155.43 | cum | 353 ₹54,866.79 | 269.16 ₹41,835.54 | 326.47 ₹50,743.23 | 353 ₹54,866.79 | 269.15 ₹41,833.98 Lowest |
| 9.00 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction 2nd t extra lift of 1.5 mtr. | 58.3 | cum | 555 ₹32,356.5 | 424.29 ₹24,736.11 Lowest | 514.63 ₹30,002.93 | 555 ₹32,356.5 | 424.29 ₹24,736.11 Lowest |
| 10.00 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction Filter Bed 3rd extra lift of 1.5 mtr. | 58.3 | cum | 574 ₹33,464.2 | 438 ₹25,535.4 | 531.25 ₹30,971.88 | 574 ₹33,464.2 | 437.99 ₹25,534.82 Lowest |
Tender Value
₹18.0 L
EMD Value
₹18,100
Closing Date
6 Jul 2026, 11:00 amClosed
Executive Engineer GWD Division 1
GWD Division-I , Delta square, Unit- 8, Bhubaneswar , 751012
Construction of 11 nos. Recharge shafts in Tanks/Ponds in Bolagarh Block ph-2 area of Khordha district for the FY -2026-27
2026_GWSI_132828_1
GWD DIV-1BBSR-03/26-27
Open Tender
Civil Works - Others
Item Rate
60 days
Bolagarh Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹18,100
Yes
6 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance & approach road for construction work | - | sqm | 2.86 | - |
| 2 | Drilling a perfectly vertical bore hole of 150mm/100mm dia in hard rock formation as required to the site condition as per direction including cost of acssesories,tools & plants,consumables & rig charges etc. complete | - | Mtr | 809.5 | - |
| 3 | Lowering Of 125mm dia blank PVC pipe 80 Sch. Without 3 mtr slot in perfectly vertical position including cost of pipes etc complete | - | Mtr | 1,095.68 | - |
| 4 | Lowering Of 125mm dia blank PVC pipe 80 Sch. With 3 mtr slot in perfectly vertical position including cost of pipes etc complete | - | Mtr | 1,100 | - |
| 5 | Operation of Compressor for development of B/W LS | - | No | 3,511 | - |
| 6 | Well Cap 5" Dia With PVC Cone | - | No | 500 | - |
| 7 | Supplying & Lying of R C C Ring 5ft made up of 6 mm dia MS rod for storage cum recharge pit including cost, transporting etc complete. | - | Nos | 1,400 | - |
| 8 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction 1st extra lift of 1.5 mtr. | - | cum | 441.17 | - |
| 9 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction 2nd t extra lift of 1.5 mtr. | 1 | cum | 695.45 | ₹694.75 |
| 10 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction Filter Bed 3rd extra lift of 1.5 mtr. | 1 | cum | 717.91 | ₹717.19 |
stage.html
html • 0.02 MB
finance_597673.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
TENDERPAPER.pdf
Tender Documents • 2.79 MB
BOQ_597673.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .