| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-AOC SOUTH THOTTAM PALAKKANTHU PO DINDIGUL WEST TALUK DINDIGUL 624 019 TAMIL NADU | 624019 | ₹33.1 L | L1 | Accepted-AOC WORK ORDER |
| 2 | L2₹34.5 L+₹1.3 L (3.97%)Rejected-Finance | ₹34.5 L+₹1.3 L (3.97%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | 33DNTPK5626K2ZF L2 | P S STALIN CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.001) Providing Cement Concrete road at Thasavanayackenpatty near Bus Stop to Rama House H/ O Pudhuchatram ESTIMATE COST : 7.70 Lakhs | |||||
| 2.00 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 13.14 | Cum | 136 ₹1,787.04 | 130 ₹1,708.2 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 47.87 | Cum | 5,657 ₹2,70,800.59 | 5,440 ₹2,60,412.8 Lowest |
| 4.00 | Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete. | 120.45 | Sqm | 567 ₹68,295.15 | 546 ₹65,765.7 Lowest |
| 5.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 46.03 | Cum | 7,015 ₹3,22,900.45 | 6,746 ₹3,10,518.38 Lowest |
| 6.00 | Provision for Bittumennpad | 6.2 | Sqm | 242 ₹1,500.4 | 233 ₹1,444.6 Lowest |
| 7.00 | Provision for Name board charges | 1 | nos | 3,120 ₹3,120 | 3,000 ₹3,000 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} | 1 | GST Amount | 1,20,312.65 ₹1,20,312.65 | 1,15,712.94 ₹1,15,712.94 Lowest |
| 9.0002) Providing Cement Concrete road at Pudhuchatram Main Road to Sagunthala House H/ O Pudhuchatram ESTIMATE COST : 8.23 Lakhs | |||||
| 10.00 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 13.62 | Cum | 135 ₹1,838.7 | 130 ₹1,770.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹34,000
Closing Date
13 Feb 2026, 3:00 pmClosed
The Project Director DRDA Dindigul
The Project Director DRDA Dindigul
Capital Grant Fund Savings and Interest Scheme 2025- 2026 Providing Cement Concrete Road and Threshing floor 4 nos in Reddiyarchatram block of Dindigul District Package No. TN05-135
2026_RDTN_652580_1
DIPR-542-Tender 2026
Open Tender
Civil Works
Item Wise
120 days
DRDA DINDIGUL
Capital Grant Fund Savings and Interest Scheme 2025- 2026 Providing Cement Concrete Road and Threshing floor 4 nos in Reddiyarchatram block of Dindigul District Package No. TN05-135
2 documents required · 2 mandatory
₹0
₹34,000
DRDA DINDIGUL
6 Apr 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
11 Feb 2026
1) Providing Cement Concrete road at Thasavanayackenpatty near Bus Stop to Rama House H/ O Pudhuchatram ESTIMATE COST : 7.70 Lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Provision for Bittumennpad
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
02) Providing Cement Concrete road at Pudhuchatram Main Road to Sagunthala House H/ O Pudhuchatram ESTIMATE COST : 8.23 Lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Provision for Bittumennpad
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
03) Providing Cement Concrete road at Thasavanayackenpatty Ponnusamy House to Sivananthan House H/ O Pudhuchatram ESTIMATE COST : 7.70 Lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Provision for Bittumennpad
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
04) Construction of Threasing Floor at Kambilinayackenpatty H/ O Pudhuchatram ESTIMATE COST : 10.00 Lakhs
Earthwork excavation and depositing on bank with initial lead and lift in hard gravelly soil for foundation etc. complete.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site and labour charges etc. complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Supplying and erecting shuttering including necessary support for plane surface in foundation Basement and Roof labs strutting upto 3.29M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations
Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials to site and labour charges etc. complete.
Painting Two Coat With Exterioir Emulsion Paint including cost and conveyance of all materials to site and labour charges etc. complete.
Supply And fixing of Cool Sheet Roofing With J Bolts Including cost and conveyance of all labour charges
Provision for Hollow Pipes For Tress Purlin Arrangements
Provision for Bitumen Pad
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_782472.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .