| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 CrAccepted-AOC UNIT NO 301 ABH TOWN SQUARE NEAR CITY CENTER MALL NASHIK TAL AND DIST NASHIK | NASHIK | NASHIK | MAHARASHTRA | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹40.6 Cr+₹1.1 Cr (2.66%)Rejected-AOC 1354 VIJAY NAGAR COLONY NILVANDI ROAD NEAR SWAMI SAMARTH KENDRA TAL DINDORI DIST NASHIK DINDORI 422202 | DINDORI | NASHIK | MAHARASHTRA | 422202 | L2 | Rejected-AOC ACCEPT | |
| 3 | L3₹41.2 Cr+₹1.7 Cr (4.22%)Rejected-AOC MAHALAXMI APPARTMENT 65 A FLAT NO 05 2ND FLOOR WHC ROAD SHANKAR NAGAR NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | 440010 | L3 | Rejected-AOC ACCEPT | |
| 4 | L4₹44.8 Cr+₹5.3 Cr (13.3%)Rejected-AOC 00 BALOD CHIKHLAKASA WARD NO 03 DALLI ROAD DURG CHHATTISGARH 491228 | BALOD | CHHATTISGARH | 491228 | L4 | Rejected-AOC ACCEPT | |
| 5 | Rejected-Technical | - | Rejected-Technical Reject |
Tender Value
₹49.1 Cr
EMD Value
₹24.6 L
Closing Date
27 May 2023, 5:00 pmClosed
Executive Egineer
Public Works Division, Achalpur
Construction of new 200 bedded hospital at Achalpur. Distt. Amravati.
2023_PWR_903373_1
ACH/06/TC/2023-24
Open Tender
Civil Works
Item Rate
730 days
Achalpur
Please Refer Tender Dacument
2 documents required · 2 mandatory
₹3,540
₹24.6 L
Yes
office of The Chief Engineer
6 Oct 2023
12 May 2023
30 May 2023
12 May 2023
27 May 2023
12 May 2023
18 May 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 6,876.44 | Cum | - | - |
| 2 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed,dewatering,preparing the bed for the foundation and necessary back filling,ramming,watering including shoring and strutting etc.complete.(Lift from1.5m to 3.0m)By Mechanical Means | 4,529.15 | Cum | - | - |
| 12 | 浥湥⁴湡瑳畲瑣牵污猠整汥⸩楷桴映汵祬愠瑵浯瑡捩洠捩潲牰捯獥潳慢敳䱐⁃楷桴匠䅃䅄攠慮汢摥爠癥牥楳汢牄浵吠灹業數⽲潣据敲整䈠瑡档洠硩瀠慬瑮⠠慐浮硩牥
瑥潣灭敬整圮瑩楦敮愠杧敲慧整䌨畲桳摥猠湡卖⁉片摡荥ࠁ牐癯摩湩湡灡汰楹杮眠瑡牥瀠潲景湩牴慥浴湥⁴獵湩捡祲楬潰祬敭潭楤楦摥挠浥湥⁴慢敳慷整牰潯楦杮挠慯⁴湩楷桴映扩敲朠慬獳洠獥業楸杮愠⁴桴慲整漠潰摷牥琠楬畱摩⠠㨲⤱戠⁹敷杩瑨挠癯牥椠杮㤠琠〱猠浱⼠欠楷桴琠潷挠慯⁴獵湩牄⸠䘠硩瑩漠污歩景挠敨業慣獬映牯洠獡湯祲愠摮挠湯牣瑥畳晲捡祢戠畲桳挠癯牥湩‷敹牡畧牡湡整湯匠慴灭倠灡牥瑥挠浯汰瑥攠捴潣灭敬整ᘮᔀ䘀᐀娀ࠁ牐癯摩湩慷整牰潯敢摤湩潦汦潯楲杮漠慂桴愠摮圠⁃㔲洠桴捩湩䌠䴮㨱″湩汣摵湩獵湩灡牰癯摥眠瑡牥瀠潲景湩潣灭畯摮椠灳捥晩敩牰灯牯楴湯愠数慭畮慦瑣牵牥灳捥晩捩瑡潩獮映牯瀠牥戠条漠散敭瑮椠据畬楤杮氠癥汥湩Ⱨ挠牵湩湡潣敶楲杮ㄠ‰敹牡畧牡湡整湯挠畯瑲映敥猠慴灭瀠灡牥漠獒㔮〰椠据畬楤杮瀠湯楤杮琠獥⁴瑥挠浯汰瑥
:ĵȈ倀潲楶楤杮眠瑡牥牰潯汰獡整湩圠䌮湡慢桴㈠‰浭琠楨正映牯搠摡湩挠浥湥⁴潭瑲牡ㄠ㌺眠瑩敮瑡映湩獩楨杮汦慯楴杮甠楳杮眠瑡牥牰潯楦杮挠浯潰湵瑡琠敨爠瑡景ㄠ欠瀠牥戠条漠散敭瑮漠灡牰癯摥洠歡湡慭畮慦瑣牵牥愠摮挠牵湩愨摮映汩楬杮樠楯瑮景丠桡湡牴灡愠摮愠祮漠瑵敬⁴祢瀠潲数汲⥹攠捴潣灭敬整FÅȈ倀潲楶楤杮椠瑮牥慮散敭瑮瀠慬瑳牥ㄠ洲桴捩湩猠湩汧潣瑡椠散敭瑮洠牯慴㨱‴楷桴畯⁴敮牥⁵楦楮桳琠潣据敲整漠牢捩畳晲捡獥湩愠汬瀠獯瑩潩獮椠据畬楤杮猠慣晦汯楤杮愠摮挠牵湩瑥挠浯汰瑥 &ÀȈ倀潲楶楤杮椠瑮牥慮散敭瑮瀠慬瑳牥㈠洰桴捩湩琠潷挠慯獴椠散敭瑮洠牯慴㨱‴楷桴畯⁴敮牥⁵楦楮桳潴挠湯牣瑥ⱥ戠楲正猠牵慦散湩愠汬瀠獯瑩潩獮椠据畬楤杮猠慣晦汯楤杮愠摮挠牵湩瑥潣灭敬整मᔀ☀᐀䐀ࠀ則問䑎䘠佌剏ⴠ䈠極摬湩㠱㌸㠮′⹃⹗ⴠ㤠㜴〮‰‽㠲〳㠮′畃††ǖȈ倀潲楶楤杮猠湡慦散汰獡整硥整湲污祬椠散敭瑮洠牯慴獵湩灡牰癯摥猠牣敥敮慳摮湩愠汬瀠獯瑩潩獮椠据畬楤杮戠獡潣瑡漠㔱洠桴捩湩挠浥湥⁴潭瑲牡ㄠ㐺甠楳杮眠瑡牥牰潯楦杮挠浯潰湵瑡ㄠ欠数散敭瑮戠条挠牵湩桴慳敭映牯渠瑯氠獥桴湡㈠搠祡湡敫灥湩桴畳晲捡景琠敨戠獡潣瑡爠畯桧琠敲散癩桴慳摮映捡摥琠敲瑡敭瑮㘠琠‸浭琠楨正椠散敭瑮洠牯慴㨱‴楦楮桳湩桴畳晲捡祢琠歡湩畯⁴牧楡獮愠摮挠牵湩潦潦牵整湥搠祡捳晡潦摬湩瑥潣灭敬整ਮᔀ✀᐀䐀ࠀ則問䑎䘠佌剏ⴠ䈠極摬湩㘲㌴㘮‱⹃⹗ⴠ㠠〴〮‰‽㐳㌸㘮‱畃††%Ȉ䜀佒乕⁄䱆住⁒⹃⹗ⴠㄠ㜰〮‰煓††иȈ倀潲楶楤杮愠摮映硩湩湩瀠獯瑩潩敄潣慲楴敶†祇獰浵戠慯摲映污敳挠楥楬杮眠瑩㈱㔮洠琠楨正䜠灹畳潢牡獤捳敲敷是硩摥†潴琠敨甠摮牥猠牴捵畴敲漠畳灳湥敤⹇⹉䜠楲潣獮牴捵整湡畳灳湥敤牦浯琠敨洠楡散汩湩潣獮獩楴杮漠散汩湩敳瑣潩獮漠楳敺㈠‵⁸〵洠慭楸畭散瑮牥琠散瑮牥搠獩慴据景㘠〰洠汩浩瑥敲瀠牥浩瑥牥挠慨湮汥愠摮椠瑮牥敭楤瑡档湡敮獬愠⁴慭楸畭散瑮牥琠散瑮牥搠獩慴据㈱〰洠汩浩瑥敲朠污慶楮敺牧摩猠潨汵敢映硩摥琠敲湩潦捲摥挠浥湥⁴潣据敲整猠慬吠敨朠灹畳潢牡桳畯摬戠楦數潴朠污慶楮敺物湯朠楲楷桴渠捥獥慳祲猠牣睥吠敨戠慯摲桳畯摬戠慴数湡楦汬摥映潲湵敤獲摩潴朠癩浳潯桴敳浡敬獳挠楥楬杮桔慲整猠潨汵湩汣摵敮散獳牡⁹摡楤楴湯污挠楥楬杮猠捥楴湯湡湩整浲摥慩整挠慨湮汥䄠摤瑩潩慮湩整浲摥慩整挠慨湮汥桳畯摬戠楦數潴猠牴灡栠湡敧獲映牯愠摤瑩潩慮畳灰牯⁴潴瀠敲敶瑮猠牴灡楰杮愠⁴癥牥⁹㈱〰洠汩浩瑥敲椠整潴戠潣灭敬整湩愠汬爠獥数瑣椠据畬楤杮渠捥獥慳祲猠敬癥獥映牯搠捵獴映湩獩楨杮漠潪湩獴挠瑵漠瑵ⱳ瀠楡瑮湩湩汣摵湩慬潢牵慭整楲污楬瑦瑥愠汬挠浯汰瑥䤠据畬楤杮愠汬瘠牥楴慣䠬牯穩湯慴瀬瑡慴
ᔀ琀᐀鼀牐癯摩湩慰瑴⽩戠湡㔷浭眠摩湯瀠慬瑳牥摥猠牵慦散ㄠ′浭琠㔱洠桴捩湩䌠䴮㨱″楬敮愠摮氠癥汥椠据畬楤杮渠慥⁴楦楮桳湩捳晡潦摬湩畣楲杮攠捴潣灭敬整ꄮ倠潲楶楤杮瀠瑡楴 慢摮ㄠ〰浭眠摩湯瀠慬瑳牥摥猠牵慦散ㄠ′浭琠㔱洠桴捩湩䌠䴮㨱″楬敮愠摮氠癥汥椠据畬楤杮渠慥⁴楦楮桳湩捳晡潦摬湩畣楲杮攠捴潣灭敬整䈮ࠀ則問䑎䘠佌剏ⴠ䈠極摬湩㠴⸷〴⬠䌠圮㘳⸸ㄴ㴠㠠㔵㠮‱畃†† 倀潲楶楤杮瀠瑡楴 慢摮ㄠ〵浭眠摩湯瀠慬瑳牥摥猠牵慦散ㄠ′浭琠㔱洠桴捩湩䌠䴮㨱″楬敮愠摮氠癥汥椠据畬楤杮渠慥⁴楦楮桳湩捳晡潦摬湩畣楲杮攠捴潣灭敬整牐癯摩湩湡楦楸杮挠楨正湥洠獥景㈠′慧杵ⱥ眠瑩扡畯⁴〳挠眠摩桴愠⁴桴番据楴湯漠⹒⹃⁃敭扭牥湡牢捩潷歲景愠灰潲敶畱污瑩⁹湩汣摵湩楦楸杮洠獥湩瀠獯瑩潩祢渠捥獥慳祲搠楲汬湩湩挠湯牣瑥䈯䈮洮獡湯祲愠摮漠祴湩祢戠湩楤杮眠物瑥挠浯汰瑥èȈ倀潲楶楤杮䜠潲癯潴爠煥極敲楳敺愠⁴灳捥晩敩潬慣楴湯愠楤敲瑣摥戠⁹湅楧敮牥瑡樠湵瑣潩景戠楲正洠獡湯祲眠污湡⹒⹃⁃敢浡牯䌠汯浵Ɱ愠⁴番据楴湯漠潣灭獯瑩慭潳牮ⱹ椠据畬楤杮猠慣晦汯楤杮楦楮桳湩Ⱨ挠牵湩瑥挠浯汰瑥
ᔀ㜀᐀ꨀࠄ畓灰祬楦楸杮愠摮椠獮慴汬瑡潩景㐠浭琠楨正䄠畬業楮浵䌠浯潰楳整倠湡汥⠠䍁⥐漠灡牰癯摥挠汯畯潦硥整湲污挠慬摤湩湩挠浯楢慮楴湯漠潳楬湡敭慴汬捩挠汯畯獲湩汣摵湩污敮散獳牡⁹牆浡睥牯Ⱬ猠灵潰瑲愠摮挠浯汰瑥敷瑡敨敳污湩獡瀠牥愠捲楨整瑣牵污搠慲楷杮桔汁浵湩畩潃灭獯瑩慐敮䄨偃
桳畯摬戠慭敤漠瑵漠桴牥潭汰獡楴潣敲漠潬敤獮瑩⁹潰祬瑥票敬敮䰠偄⁅ㄨ〰‥楶杲湩洠硩Ⱙ猠湡睤捩敨敢睴敥睴污浵湩畩桳敥獴漠䱁佌⁙則䑁ⵅ†〵〰猠牥敩ⱳ攠捡潮⁴敬獳琠慨⸰〵洠桴捩Ⱬ琠瑯污琠楨正敮獳漠污浵湩畩潣灭獯瑩慰敮獬渠瑯琠敢氠獥桴湡㐠洠Ɑ琠敨攠灸獯摥猠牵慦散琠敨敲景猠慨汬栠癡瑓癯慬煣敵敲楦楮桳湩潣瑡渠瑯氠獥桴湡⠠㘲⬠ⴠ㈠
業牣湯⠠潣瑮楡楮杮洠湩浩浵㜠┰欠湹牡㔠〰戠獡摥倠䑖⥆漠潣潬牵愠摮猠慨敤愠数牡档瑩捥畴慲敤楳湧桔湩楳敤猠牵慦散⠠慦楣杮琠敨戠極摬湩硥整楲牯猠牵慦散猩慨汬栠癡潰祬瑳牥戠獡摥瀠睯敤潣瑡湩潮⁴敬獳琠慨㔲䴠捩潲楷桴瀠潲整瑣癩数汥漭晦映楯湯琠敨攠瑸牥潩慦散⠠数汥漠晦映汩楷汬椠潮挠獡敬癡湡⁹摡敨楳敶洠牡癯牥琠敨挠浯潰楳整瀠湡汥猠牵慦散愠瑦牥椠⁴獩瀠敥敬景⥦桔畳灰牯楴杮映慲敭潷歲猠慨汬戠慭敤漠瑵漠〵洠㉘洵⁘洳桴捩汁浵湩畩敳瑣潩潴戠灳捡摥栠牯穩湯慴汬⁹湡敶瑲捩污祬映牯映硩湩ĊƼ̈倀潲楶楤杮愠摮氠祡湩楶牴晩敩業牲牯⼠朠潬獳⁹楦楮桳琠汩獥搠捥牯瑡癩祴数删䭁 態慪楲⽡丠瑩潣 獁慩牯攠畱癩污湥⁴慭敫栠癡湩楳敺㔠〹洠潴㘠㔰洠⁸㤵‰浭琠〶‵浭漠‸潴ㄠ‰浭琠楨正敮獳愠摮挠湯楦浲湩潴䤠⹓ㄠ㘵㈲〲㘰⠠朠潲灵䈠慬
景愠灰潲敶慭敫桳摡湡慰瑴牥潦汦潯楲杮椠敲畱物摥瀠獯瑩潩慬摩漠敢景ㄠ㐺挠浥湥⁴潭瑲牡椠据畬楤杮渠慥⁴散敭瑮映潬瑡楦汬湩潪湩獴畣楲杮愠摮挠敬牡湩瑥挠浯汰瑥愠
汆潯楲杮†楔敬ᕳᘀ最ᜀꨀᘁ褀ࠁ牐癯摩湩湡慬楹杮瘠瑩楲楦摥洠物潲 汧獯祳映湩獩楴敬慨楶杮猠穩㤵‰浭琠〶‵浭砠㔠〹洠潴㘠㔰洠景㠠琠〱洠桴捩湫獥湡潣普物業杮琠卉㔱㈶ⴲ〲㘰⠠朠潲灵䈠慬
景愠灰潲敶慭敫桳摡湡慰⁴整湲映牯映潬牯椠杮椠敲畱物摥瀠獯⁴潩慬摩漠敢景ㄠ㐺挠浥湥⁴潭慴湩汣摵湩敮瑡挠浥湥⁴汦慯⁴楦氠楬杮樠楯瑮ⱳ挠牵椠杮愠摮挠敬牡椠杮攠捴潣灭敬整戮
歓物楴杮圠䱁⁌䥔䕌牓ᔁ缀ᘁ⨀ࠁ牐癯摩湩湡慬楹杮䄠瑮獩楫敃慲業楴敬景愠灰潲敶畱污瑩⁹景猠穩〳挠⁸〳挠湡潣普物業杮琠卉ㄠ㘵㈲㈭〰‶䜨潲灵䈭䤠䅉
潦湡楴歳摩映潬牯湩湩爠煥極敲潰楳楴湯氠楡湯愠戠摥漠㨱‴散敭瑮洠牯慴湩汣摵湩散敭瑮映潬瑡楦汬湩潪湩⁴楷桴挠浥湥⁴汳牵祲挠敬湡湩畣楲杮攠捴潣灭敬整ਮ?ĹЈ倀潲楶楤杮愠摮氠祡湩散慲業楴敬慨楶杮猠穩〳挠砠㘠‰浣潣普物業杮琠潣敲灳湯楤杮䤠匮潦慤潤愠摮猠楫瑲湩湩爠煥極敲潰楳楴湯眠瑩敲摡⁹慭敤愠桤獥癩潭瑲牡漠灡牰癯摥焠慵楬祴漠汰獡整景ㄠ㈺挠浥湥⁴潭慴湩汣摵湩潪湩⁴楦汬湩楷桴眠楨整 潣潬牵挠浥湥⁴汳牵祲挠敬湡湩畣楲杮攠捴潣灭敬整"evīȈ倀潲楶楤杮愠摮氠祡湩湩瀠獯瑩潩汦潯楲杮漠整敬桰湯汢捡 流慢圠楨整⼠䌠瑡戠牡⁹牢睯 畒祢爠摥⼠传散湡䈠潲湷朠慲楮整猠潴敮漠灡牰癯摥猠慨敤愠摮猠穩㠱洠潴㈠‰浭琠楨正漠敢㨱‶散敭瑮洊牯慴湩汣摵湩散敭瑮映潬瑡瑳楲楫杮樠楯瑮ⱳ瀠楯瑮湩湩䌠䴮㨱″畣楲杮愠摮挠敬湡湩瑥挠浯汰瑥ƟЈ倀潲楶楤杮愠摮映硩湩慭档湩畣⁴慭档湩潰楬桳摥ㄠ‸浭琠〲洠桴捩整敬桰湯汢捡 流慢圠楨整⼠䌠瑡戠牡⁹牢睯 䉒⁉敲 捏慥牂睯牧湡瑩瑳湯潦牴慥獤愠摮爠獩牥景猠整獰愠摮猠慴物慣敳景愠灰潲敶潣潬牵愠摮猠慨敤眠瑩畦汬洠畯摬湩湡桴敲牧潯敶楬敮映牯琠敨琠敲摡湯戠摥漠㨱‴敃敭瑮洠牯慴湩汣摵湩汦慯⁴楦汬湩潪湩獴眠瑩敮瑡挠浥湥⁴汳牵祲挠牵湩潰楬桳湩湡汣慥楮杮†瑥挠浯汰瑥¾źȈ倀潲楶楤杮愠摮氠祡湩散敭瑮挠湯牣瑥汦潯楲杮㔠‰浭琠楨正眠瑩ㅍ‵散敭瑮挠湯牣瑥慬摩琠牰灯牥氠癥汥愠摮猠潬数椠污整湲瑡慢獹椠据畬楤杮挠浯慰瑣潩楦汬湩潪湩獴慭歲湩 | 278.78 | Cum | - | - |
| 13 | FIRST FLOOR | 0.4 | Cum | - | - |
| 14 | SECOND | 0.4 | Cum | - | - |
| 15 | THIRD FLOOR | 0.6 | Cum | - | - |
| 17 | GROUND FLOOR - Building - 423.98 + C.W. - 50.84 = 474.82 Cum. | 1 | Cum | - | - |
| 18 | FIRST FLOOR | 0.6 | Cum | - | - |
| 19 | SECOND | 0.4 | Cum | - | - |
| 20 | THIRD FLOOR | 0.2 | Cum | - | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1574548.xls
BOQ Document • 0.93 MB
120749425.pdf
Tender Document • 1.43 MB
1.200beddedhospitalatachalpur.pdf
Tender Document • 4.11 MB
120749427.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .