Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Fee/PreQual/Technical/Finance 234 NH 7 COLONY PERUMALPURAM TIRUNELVELI DISTRICT | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹11.6 L+₹1.6 L (16.1%)Admitted-Fee/PreQual/Technical/Finance 6 2 SIVAN NORTH CAR STREET PALAYAMKOTTAI TIRUNELVELI 2 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹12.1 L+₹2.1 L (20.6%)Admitted-Fee/PreQual/Technical/Finance 19 96A PERUNGODU NEYYOOR | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹12.2 L+₹2.2 L (21.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/S VIJAY INFRATECH L2 | M MANI L4 | SUBASH L3 | S MAHARAJAN L1 |
|---|---|---|---|---|---|---|---|
| 2.00Strengthening of Pillaiyarkoil to Appuvilai Burial Ground Road 0/308 - 0/730 | |||||||
| 3.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect. | 303.84 | Sq.m | 5.17 ₹1,570.85 | 5.44 ₹1,652.89 | 6 ₹1,823.04 | 4.5 ₹1,367.28 Lowest |
| 4.00 | Picking 5 cm to 10 cm old metalled surface and sectioning | 527.5 | Sq.m | 18.98 ₹10,011.95 | 19.97 ₹10,534.18 | 19 ₹10,022.5 | 16.2 ₹8,545.5 Lowest |
| 5.00 | Earth work excavation and depositing on Bank initial lead and lift in hard gravally soil for cutting side drain etc compl as per SS20A | 170.91 | Cum | 114.12 ₹19,504.25 | 120.08 ₹20,522.87 | 100 ₹17,091 | 98.2 ₹16,783.36 Lowest |
| 6.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 37.98 | Cum | 227.78 ₹8,651.08 | 269.32 ₹10,228.77 | 300 ₹11,394 | 196.2 ₹7,451.68 Lowest |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 197.81 | Cum | 2,070.18 ₹4,09,502.31 | 1,900 ₹3,75,839 | 1,870 ₹3,69,904.7 | 1,783.5 ₹3,52,794.14 Lowest |
| 8.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,582.5 | Sq.m | 84.14 ₹1,33,151.55 | 91.24 ₹1,44,387.3 | 90 ₹1,42,425 | 72.5 ₹1,14,731.25 Lowest |
| 9.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,582.5 | Sq.m | 21.53 ₹34,071.23 | 23.7 ₹37,505.25 | 25 ₹39,562.5 | 18.5 ₹29,276.25 Lowest |
| 10.00 | Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 39.56 | Cum | 11,951.87 ₹4,72,815.98 | 13,646.67 ₹5,39,862.27 | 13,850 ₹5,47,906 | 10,297 ₹4,07,349.32 Lowest |
| 11.00 | Providing Rumble Strips covered with Premix Bituminous Caropet 20mm high at center,250mm vide placed at 1m center to center at approved locatioons to control speed marked with white strips of road marking paint. | 1.88 | Sq.m | 333.3 ₹626.6 | 150 ₹282 Lowest | 429 ₹806.52 | 287.1 ₹539.75 |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
18 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (B.pt), Radhapuram
Block Development Office, Radhapuram
Strengthening of Pillaiyarkoil to Appuvilai Burial Ground 0/308-07/730 in Appuvilai Panchayat in Radhapuram Panchayat Union R-205
2026_RDTN_720650_1
A3/2595/2026
Open Tender
Civil Works
Item Rate
180 days
Block Development Office, Radhapuram
As per Tender document
4 documents required · 4 mandatory
₹0
₹18,000
Block Development Office, Radhapuram
19 Nov 2026
3 Nov 2026
19 Nov 2026
3 Nov 2026
18 Nov 2026
3 Nov 2026
6 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Strengthening of Pillaiyarkoil to Appuvilai Burial Ground Road 0/308 - 0/730 | - | - | - | - |
| 3 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect. | 303.84 | Sq.m | 6.36 | ₹1,932.42 |
| 4 | Picking 5 cm to 10 cm old metalled surface and sectioning | 527.5 | Sq.m | 23.36 | ₹12,322.4 |
| 5 | Earth work excavation and depositing on Bank initial lead and lift in hard gravally soil for cutting side drain etc compl as per SS20A | 170.91 | Cum | 140.45 | ₹24,004.31 |
| 6 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 37.98 | Cum | 280.34 | ₹10,647.31 |
| 7 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 197.81 | Cum | 2,547.91 | ₹5,04,002.08 |
| 8 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,582.5 | Sq.m | 103.56 | ₹1,63,883.7 |
| 9 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,582.5 | Sq.m | 26.5 | ₹41,936.25 |
| 10 | Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 39.56 | Cum | 14,709.99 | ₹5,81,927.2 |
| 11 | Providing Rumble Strips covered with Premix Bituminous Caropet 20mm high at center,250mm vide placed at 1m center to center at approved locatioons to control speed marked with white strips of road marking paint. | 1.88 | Sq.m | 410.22 | ₹771.21 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
sfcappuvilai.pdf
Tender Documents • 1.09 MB
ADDITIONAL.pdf
Additional Documents • 0.16 MB
BOQ_865419.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .