Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAccepted-AOC | ₹34.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹34.1 L+₹2,422.71 (0.07%)Rejected-AOC | ₹34.1 L+₹2,422.71 (0.07%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected (As per PD, DRDA Registration order SD construction contractor having limit 30 laks only.And also SD construction not having Building construction experience. Hence SD construction technical bid is not eligible for this tender) |
Tender Value
₹34.6 L
EMD Value
₹34,600
Closing Date
23 Jan 2025, 3:00 pmClosed
BDO (BP)
BDO Office, Nangavalli
Construction of Two Class Room Building in PUM School at Andikarai H/o Gonur Panchayat Nangavalli Block at Salem District NABARD Scheme Fund -2024-2025 Work No.03
2025_RDTN_518169_2
Roc.No.1290/2024/A2
Open Tender
Civil Works - Buildings
Item Wise
BDO Office, Nangavalli
As per tender document
3 documents required · 3 mandatory
₹0
₹34,600
25 Jul 2025
11 Jan 2025
23 Jan 2025
11 Jan 2025
23 Jan 2025
11 Jan 2025
Amount
1.)Construction of Two Class room Building in PUM School at Andikarai H/o Gonur.
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement etc.,
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Filling with Collected M-sand as per standard specifications etc complete
Refilling with excavated earth as per standard specifications etc complete
Brick work in cement Mortor 1:5 (One cement and five sand) using country Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete.
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) for column footing. (Footing)
Column and sunshade
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Weathering course with brick jelly lime concrete in the proportion of 32:12.5 by volume including cost and conveyance of all and labour charges etc. complete.
Cement Concrete in 1 : 2 : 4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Finishing the top of roof with one course of pressed tiles of size 20 X 20 X 2 mm laid in CM 1:3 12 mm thick mixes with W.P. compound laid 2 % weight of cement etc., complete.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Paving the floor Anti skid tiles of any colour and any size laid in CM 1:3, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the sta
Paving the floor with Paving the floor with kotta stone of size 610x610x 20mm in Cement mortar 1:3 etc., complete complying with standard specifications and as directed by the departmental officers.
Supply of steel doors including cost and convyance and all charges etc complete.etc complete
Supply of steel windows including cost and convyance and all charges etc complete.etc complete.
Labour charges for fixing Doors alongwith frames in position etc., complete (finished work) as per serial no 154 and item no 19
Labour charges for fixing Windows and Ventilators alongwith frames in position etc., complete (finished work) as per serial no 155 and item no 20
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work).
Painting two coats over new iron work using synthetic enamal paint including cost and conveyance of all materials to site etc complete
Distempering 2 coats with approved Distemper over one coat of Primaring coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with std, specification.
Painting two coats with approved Plastic Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B) ( NEW SURFACE)
Supply and fixing of Cuddapah slab of 20/30mm thick including cost and conveyance and all charges etc complete.
Electrical Arrangments
Fan / Light Point SD 23
Plug point SD 36
GI Service wire SD 65
GI pipe for service connection SD 70
TNEB Meter Board SD 127
Tube light SD 88
48" Ceiling fan SD 106
MCB with ISI Standared SD 167
Provisions for drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Provisions for Magnetic Steel Ceramic Green Writing Board with Aluminium Sheet (size 2.40 x 1.20m)
Provisions for Fibre White Writing Board (LR) 1.20m x 1.20 m)
Chappal Rack 1 Arrangements
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Exterior Emulsion two coats to the outside of the Building using best approved best quality of Ccement Paint including cost of Cement Paint, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall)
Chappal Rack 2 Arrangements
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Exterior Emulsion two coats to the outside of the Building using best approved best quality of Ccement Paint including cost of Cement Paint, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall)
Rainwater Harvesting Structure
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Cost and Supply of Sand filling from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of 40mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of 20mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion two coats to the outside of the Building using best approved best quality of Ccement Paint including cost of Cement Paint, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall)
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc.,
Provisions for Cubboard& lock arrangements for Teacher 1 ( As per sub estimate)
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provisions for Cubboard& lock arrangements for Teacher 2 ( As per sub estimate)
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provisions for Cubboard& lock arrangements for Students 1 ( As per sub estimate)
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provisions for Cubboard& lock arrangements for Students 2 ( As per sub estimate)
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase near wet riser using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick will be provided with tubular supports made of 304L Grade Stainless Steel pipe of 25mm dia of 1.60mm thick welded to the railing. The supports will be grouted into the wall and provided with 93.00mm thick Stainless Steel circular base plate of 304 Grade. The rate shallincluded for grouting into concrete with necessary supporting arrangements the hand rail in floor polishing buffing, bonding, cutting, grinding, conveyance, welding charges, electrical charges, etc. complete SOR Page 98
Provision for Display Notice board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SMB Construction (BID ID -1236289)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .