Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹30.4 LAccepted-AOC 0 JANKI NAGAR NEAR SURAJ HOTEL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | ₹30.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹30.5 LRejected-Finance | ₹30.5 L | 2 | Rejected-Finance L2 |
| 3 | 3₹30.5 LRejected-Finance | ₹30.5 L | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/s PARI ENTERPRISES L1 | ASHOK KUMAR THEKEDAR L3 | M/s Shree Dauji Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge | 77.65 | Cum | 500 ₹38,826 | 517 ₹40,146.08 | 518 ₹40,223.74 |
| 2.00 | Earthwork in foundation in dry ordinary soilincluding lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in charge upto distance of 30m from the foundation trenches for other structure. | 231.94 | Cum | 100 ₹23,193.8 | 100 ₹23,193.8 | 99 ₹22,961.86 |
| 3.00 | Providing concrete for plain or Reinforced cement concrete M 15 grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 21.48 | Cum | 6,200 ₹1,33,169.8 | 6,209 ₹1,33,363.11 | 6,209 ₹1,33,363.11 |
| 4.00 | Providing concrete for Reinforced cement concrete M20 grade in including cost of finishing etc and excluding reinforcement in 1:1.5:3(1cement :1.5 coarse sand:2 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 148.42 | Cum | 7,350 ₹10,90,857.6 | 7,399 ₹10,98,129.98 | 7,399 ₹10,98,129.98 |
| 5.00 | Providing concrete for Reinforced cement concrete M25 grade in including cost of finishing etc and excluding reinforcement in 1:1:2(1cement :1 coarse sand:2 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 51.86 | Cum | 7,560 ₹3,92,091.84 | 7,574 ₹3,92,817.94 | 7,574 ₹3,92,817.94 |
| 6.00 | Centering And Shuttering For bridge slabs above 3M span span | 402.64 | Sqm | 860 ₹3,46,270.4 | 860 ₹3,46,270.4 | 860 ₹3,46,270.4 |
| 7.00 | Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc | 112.58 | Sqm | 570 ₹64,167.75 | 575 ₹64,730.63 | 575 ₹64,730.63 |
| 8.00 | Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST. | 10.64 | MT | 76,971 ₹8,18,663.56 | 76,971 ₹8,18,663.56 | 76,971 ₹8,18,663.56 |
| 9.00 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 200 m lead as per directed by Engineer- in-Charge | 375 | Cum | 150 ₹56,250 | 157 ₹58,875 | 157 ₹58,875 |
| 10.00 | Earthwork in removing bundha diversion including disposal of removed earth as per directed by engineer in charge incluing lift of 1.5m and lead upto 30m with all cost of labour material T&P etc complete. | 187.5 | Cum | 63 ₹11,812.5 | 63 ₹11,812.5 | 63 ₹11,812.5 |
Tender Value
₹30.5 L
EMD Value
₹3.0 L
Closing Date
19 Jan 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
Irrigation Division, Firozabad
Reconstruction of VRB at km. 38.816 of Harnad Drain
2026_UPIDC_1104617_4
07/EE/2025-26
Open Tender
Civil Works
60 days
Reconstruction of VRB at km. 38.816 of Harnad Drai
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹3.0 L
13 Mar 2026
13 Jan 2026
19 Jan 2026
13 Jan 2026
19 Jan 2026
13 Jan 2026
Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge
Earthwork in foundation in dry ordinary soilincluding lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in charge upto distance of 30m from the foundation trenches for other structure.
Providing concrete for plain or Reinforced cement concrete M 15 grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.
Providing concrete for Reinforced cement concrete M20 grade in including cost of finishing etc and excluding reinforcement in 1:1.5:3(1cement :1.5 coarse sand:2 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.
Providing concrete for Reinforced cement concrete M25 grade in including cost of finishing etc and excluding reinforcement in 1:1:2(1cement :1 coarse sand:2 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.
Centering And Shuttering For bridge slabs above 3M span span
Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc
Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST.
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 200 m lead as per directed by Engineer- in-Charge
Earthwork in removing bundha diversion including disposal of removed earth as per directed by engineer in charge incluing lift of 1.5m and lead upto 30m with all cost of labour material T&P etc complete.
Finishing walls with putty and (Two coats) with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr/10sqm curing, cost of all materials, labours, T&P etc. required for proper completion of the work.
supply and filling fine sand in Layers for Retaining wall, wing wall etc with all cost of material,taxes,royalty,labours T&Ps etc complete excluding GST.
Providing and laying 75 mm P.V.C. Pipe for Slab & Abutment.
Supplying and fixing of sign board at site having a frame of 900x600x2000 mm fixing at on 35x35x5 mm angle iron includng painting and lettering double side complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_2040348.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid